Site Plan
Shows property lines, deck footprint, setbacks, and nearby structures; used to verify zoning compliance and required clearances with local jurisdiction standards.
A precise drawing improves safety, streamlines permitting, and reduces construction delays by documenting load paths, fastener details, and material types. It provides a single authoritative source for builders, inspectors, and owners.
The drawing serves as a coordination tool: owner expectations, buildable details, and inspection checkpoints are all established from the same set of documents.
A licensed architect or structural engineer signs and seals structural drawings when local regulations require professional certification; their signature attests to code compliance and calculations.
The owner or general contractor signs approval blocks to confirm scope, costs, and acceptance of specified materials and scheduling; signature binds parties to the documented work.
Shows property lines, deck footprint, setbacks, and nearby structures; used to verify zoning compliance and required clearances with local jurisdiction standards.
Top-down layout indicating dimensions, post locations, stairs, railings, and access points so contractors can translate layout directly to the site.
Documents joist spans, beam sizes, ledger attachments, hanger types, and spacing; critical for structural review and accurate material ordering.
Zoomed drawings of ledger-to-house connections, post-to-beam assemblies, and footing-to-post interfaces showing fastener types and corrosion protection requirements.
Specifies footing sizes, depths, reinforcement, and soil-bearing assumptions to ensure safe transfer of loads to the ground under local frost-depth and soil conditions.
Lists lumber species/grades, hardware specifications, fasteners, preservative requirements, and finish materials to prevent ambiguity during procurement.
| Field | Setting | Action | Value |
|---|---|
| Document Upload | PDF/A preferred; include all sheets combined into one file. |
| Field Placement | Add signature, date, and checkbox fields where signatures and approvals are required. |
| Signer Order | Set licensed professional first, owner second, then contractor. |
| Authentication | Use email or SMS codes; add ID verification for critical approvals. |
Ensure the chosen workflow retains a certificate of completion and meets any professional-seal or state electronic signature rules before submitting to the permitting authority.
Two to eight weeks depending on workload and jurisdiction.
One to three weeks for stand-alone structural checks.
Allow one to two weeks per resubmission round.
Often follows final approval within days to a week.
Schedule final inspection after framing and decking complete.
Homeowner hires architect to prepare drawings for permit submission
General contractor receives completed drawing set for bidding
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Vendor-specific trial | Vendor-specific trial | Vendor-specific trial | Vendor-specific trial |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |