Title Sheet
Project name, address, owner, designer contact, index of sheets, revision block, and project notes required for submissions and recordkeeping.
A fully developed Architectural Drawing Set reduces ambiguity during permitting and construction, shortens review cycles, and limits change orders. Clear drawings help ensure code compliance, accurate cost estimating, and smoother coordination among architects, engineers, and contractors.
The Architectural Drawing Set is created and consumed by a multi-disciplinary team depending on project scale and delivery method.
Responsibility for assembling, stamping, and issuing the final set usually rests with the licensed design professional or firm that holds project responsibility.
Project name, address, owner, designer contact, index of sheets, revision block, and project notes required for submissions and recordkeeping.
Shows property boundaries, setbacks, grading, access, utilities, and north arrow; used by reviewers to confirm zoning and site code compliance.
Dimensioned layouts for each level showing room names, circulation, exit routes, and key fixtures used for pricing and code analysis.
Exterior views showing finished materials, heights, and building massing needed for planning approval and material takeoffs.
Cut-through views and enlarged details explaining wall assemblies, structural connections, and finish transitions for construction execution.
Door, window, finish, and equipment schedules plus referenced specs that define product performance and installation requirements.
| Field | Configuration |
|---|---|
| Access Control | Role-based permissions for designers and reviewers |
| Versioning | Enforce single source of truth with enforced check-in/out |
| Signature Order | Sequential sign-off by architect, engineer, then owner |
| Audit Trail | Retain timestamps, IP, and signer identity |
Use platforms that support stamped PDFs, large file transfers, and a robust audit trail to preserve legal and construction records.
Expect 2–8 weeks for a first review in many municipalities.
Allocate 2–4 weeks per revision cycle for reviewer re-checks.
Some jurisdictions offer expedited review for additional fees.
After approvals, issuance typically occurs within 1–4 weeks.
Begin only after receiving the stamped permit set.
The licensed architect of record typically signs and affixes the professional seal to the sheets they prepared or are responsible for. Their signature attests to design compliance with applicable codes and professional standards.
A contractor or responsible superintendent may sign issuance receipts or construction affidavits acknowledging receipt of the issued-for-construction documents and acceptance of the stated scope and responsibilities.
Their team transitioned permitting to online delivery to reduce travel and paper handling.
BIS implemented a controlled digital distribution system for construction documents.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |