Orthogonal Views
Front, rear, and side elevations drawn to the project scale that show building height, grade relationships, and roof geometry for each façade.
Clear, correct elevations reduce permit delays, prevent construction change orders, and provide a single source of truth for façade materials, heights, and openings. They support code review, cost estimating, and coordination among structural, mechanical, and glazing trades while documenting compliance for inspections and final approval.
Teams across design and construction use exterior elevations at different project stages and for regulatory submissions.
Delivering precise elevations helps all stakeholders reduce risk, align expectations, and speed approval and construction workflows.
Front, rear, and side elevations drawn to the project scale that show building height, grade relationships, and roof geometry for each façade.
Clearly labeled scale, overall heights, floor heights, window and door extents, and critical dimensions for construction and prefabrication accuracy.
Surface materials and assemblies identified with notes and keyed references to the specifications, including colors, finishes, widths, and joint treatments.
Window and door schedules, lintel and sill conditions, and referenced detail drawings for flashing, waterproofing, and attachment methods.
Code and performance notes, thermal/solar considerations, trim heights, and references to structural or mechanical coordination requirements.
Where required by jurisdiction, stamped and signed elevations bearing the licensed architect or engineer seal and revision block for official submissions.
| Field | Configuration |
|---|---|
| Signature Block | Require licensed professional signature and date |
| File Format | Submit PDF/A for archival compatibility |
| Authentication | Enable two-factor or ID verification for seal |
| Integrations | Connect to project storage and permit portals |
Many permitting authorities and project teams expect PDF-based submissions and secure signature provenance when receiving exterior elevations.
Ensure the chosen platform supports required file formats, audit trails, and authentication methods expected by the local authority having jurisdiction.
Local plan review commonly takes 2–6 weeks depending on workload and project scope.
Address review comments and resubmit within the timeframe specified by the reviewer, often 2–4 weeks.
After approvals and fees, issuance may occur within days to several weeks based on agency staffing.
Allow 2–3 weeks for competitive subcontractor bids once elevations and specs are issued.
Minor revisions can typically be processed in 1–2 weeks; major design changes extend the schedule.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varied | Varied | Varied | Varied |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |