Scale
Consistent, documented scale (for example 1/8"=1'-0") with a graphic scale so reviewers can verify dimensions directly from the sheet.
A well-prepared floor plan clarifies scope, supports permit approval, minimizes construction errors, and establishes a single reference for bidding and coordination across trades.
The Architectural Floor Plan is created and used by multiple parties across design, construction, and permitting.
Each stakeholder relies on the plan for distinct decisions — accuracy and version control are essential throughout the project lifecycle.
A licensed architect or registered professional prepares, stamps, and signs architectural floor plans when required by law; their signature attests to professional responsibility and compliance with local practice acts, and may be required for permit acceptance.
The general contractor or construction manager does not usually stamp plans but signs contract exhibits and acknowledges responsibility for construction based on the plan; contractors must verify dimensions and discrepancies before proceeding to avoid claim disputes.
| Field | Configuration |
|---|---|
| File Format | PDF/A or DWG with linked PDF |
| Reviewer Order | Architect → Engineer → Contractor → Owner |
| Required Fields | Project, scale, stamp, revision date |
| Archive Policy | Auto-save signed sets to project folder |
Verify file formats, signer authentication, and integration options before e-submitting floor plans to avoid rejections.
Align your eSubmission method with the receiving authority’s requirements and retain audit logs for the signed set.
Consistent, documented scale (for example 1/8"=1'-0") with a graphic scale so reviewers can verify dimensions directly from the sheet.
Clear room labels, circulation paths, and furniture or equipment outlines to demonstrate intended use and avoid misinterpretation.
Critical linear dimensions for walls, openings, and clearances shown with reference lines to prevent on-site measurement errors.
Notations for egress, accessibility, fire rating, and applicable building codes that reviewers use to verify compliance.
Basic mechanical, electrical, and plumbing locations or references to separate MEP drawings to reduce trade clashes.
Readable legend of symbols, material callouts, and finish schedules so contractors interpret drawings consistently.
Provide the final plan as a locked, stamped PDF for permitting and as an optional DWG or DXF for coordination with consultants and trades.
Attach relevant elevations, sections, structural sketches, and MEP layouts to give reviewers the context needed to approve the plan.
Include an as-built or demolition note when plans modify existing structures to clarify what remains and what changes are proposed.
Embed a revision table listing dates, authors, and brief descriptions so reviewers can track changes across submissions.
2–8 weeks depending on jurisdiction and project complexity
1–4 weeks for common corrections
Varies widely; expedited reviews may shorten time
After permit issuance and contractor mobilization
Final as-built set submitted typically at project closeout
Prepare final plan set and supporting documents for submission.
Obtain client sign-off on the issued-for-permit set.
Deliver stamped plans to the authority having jurisdiction for review.
Begin site work once permit is issued and contractor is mobilized.
Optica Ventures adopted signed digital plan sets to streamline client reviews and reduce delivery back-and-forth.
A property developer switched to digitally signed floor plans for renovation projects to avoid in-person meetings during procurement.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (paid tiers) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |