Scaled Plans
Floor plans at appropriate scale showing exact locations, clear dimensions, and relation to other building elements.
Clear Architectural Installation Drawings reduce coordination errors, support faster permitting, and limit change orders. When executed with intent and retained accurately they satisfy electronic signature standards under ESIGN (15 U.S.C. ch. 96) and intrastate rules under UETA where adopted.
Multiple stakeholders prepare, review, or sign installation drawings during design, permitting, and construction phases.
Responsibility for accuracy typically rests with the licensed design professional and the contractor during installation and sign-off.
Floor plans at appropriate scale showing exact locations, clear dimensions, and relation to other building elements.
Cross-sections illustrating vertical relationships, clearances, and installation heights through assemblies.
Enlarged connection and interface drawings showing fasteners, flashing, edge conditions, and tolerances.
Tables listing fixtures, finishes, equipment models, and quantities with manufacturer references.
Scope notes, material specifications, and referenced standards needed to meet performance and code.
Revision history with dates and descriptions so the construction team can track changes.
| Field | Configuration |
|---|---|
| Authentication | Email link plus SMS code for signer verification |
| Conditional Fields | Show installer checklists only to designated subcontractor roles |
| Template | Use a revision-controlled template for cover sheets |
| Export | Export signed set as flattened PDF/A for archives |
Ensure the chosen platform supports the required file formats, signer authentication, and retention policies before issuing drawings.
Enterprises often require SSO and audit trails; confirm platform encryption, retention, and compliance capabilities before sending sealed or stamped drawings.
Release drawings so subcontractors can price the work
Coordinate trades and resolve open RFIs before mobilization
File required sealed drawings for building department approval
Obtain final installer and inspector approvals on the signed set
Allow 3–10 business days for coordinated revisions
Local review often 2–8 weeks depending on jurisdiction
Order critical items 6–12 weeks ahead of install
Submit final signed set within contract-specified period
Keep final signed drawings per record retention rules
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Trial varies | Trial varies | Trial varies | Trial varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
An architecture firm issued a coordinated MEP and millwork set for a tenant build-out.
A hospital required sealed install drawings for medical gas and equipment mounts.