Project Description
Concise scope summary including use, square footage, occupancy classification, and phasing to orient reviewers and determine applicable codes.
A complete Architectural Project Application reduces review delays, limits re-submittals, and clarifies regulatory obligations. Accurate documentation supports faster permit issuance, lowers the risk of code noncompliance, and creates a clearer record for contractors and owners during construction.
Typical participants include licensed architects, project owners, contractors, and local permitting officials; each party has distinct responsibilities during preparation and submission.
Distribution and signature authority depend on the document sections; ensure each signer is authorized by the owner or contracting entity.
Concise scope summary including use, square footage, occupancy classification, and phasing to orient reviewers and determine applicable codes.
Scaled plan showing property lines, setbacks, utilities, access, grading, and stormwater provisions required for zoning and drainage review.
Architectural, structural, mechanical, electrical, and plumbing drawings with scales, details, and referenced code sections to support permit approval.
Structural calculations, energy code compliance reports, and specialized studies (noise, traffic, geotechnical) when applicable to the project.
Stamped drawings, license numbers, insurance declarations, and signed statements confirming the architect or engineer of record.
Completed application forms, payment method or proof, and any local checklists required for initial acceptance and routing.
| Field | Configuration |
|---|---|
| Document Grouping | Bundle drawings, reports, and forms by discipline |
| Required Fields | Enforce formats (MM/DD/YYYY, license format) |
| Reviewer Roles | Assign zoning, structural, and MEP reviewers |
| Notifications | Enable email alerts for reviewer actions |
Choose file formats and delivery channels accepted by the authority to avoid acceptance delays.
Confirm specific municipal portal requirements before upload and retain a timestamped copy of the submitted package for auditability.
Usually same day to 7 business days for completeness check
Often 15–60 calendar days depending on workload
Commonly 10–30 days to address reviewer comments
After approvals; timing depends on fee payment and permits
Post-permit; contractor schedules per municipal procedures
Compile plans, reports, and signatures for filing.
Municipal intake checks completeness and fees.
Revise and resubmit corrected documents as required.
Permit issued after approvals and fee reconciliation.
| Criteria | Electronic Submission | Paper Submission |
|---|---|---|
| Acceptance | varies by office | |
| Audit Trail | detailed | minimal |
| Processing Time | typically shorter | often longer |
| Storage | digital archive | physical files |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (premium tier) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies | Varies | Varies |