Site Plan
Shows property boundaries, setbacks, contours, utilities, easements, access, and adjacent right-of-way information; used for zoning review, grading, and coordination with civil and landscape disciplines during permit submission.
An Architectural Project Set centralizes technical information, reduces coordination errors, and accelerates permitting and bidding. Clear documentation improves contractor pricing accuracy, minimizes change orders, and creates a defensible record for regulatory review, dispute resolution, and facility operations.
Architects, engineers, contractors, owners, and municipal reviewers rely on the Architectural Project Set for design coordination and permit review.
Accurate, fully coordinated Architectural Project Sets reduce risk, streamline approvals, and serve as a long-term record for operations and legal reference.
Shows property boundaries, setbacks, contours, utilities, easements, access, and adjacent right-of-way information; used for zoning review, grading, and coordination with civil and landscape disciplines during permit submission.
Dimensioned layouts for each level showing room uses, circulation, egress paths, door/window locations, and key finish notes needed for pricing, code review, and contractor layout.
Exterior faces with material callouts, fenestration patterns, roof slopes, and vertical dimensions to confirm aesthetics, cladding sequences, flashing details, and constructability with subcontractors and suppliers.
Cut-through drawings and enlarged details clarifying wall assemblies, connections, thermal and moisture control, flashing, and critical construction tolerances required by inspectors and trades for proper installation.
Framing plans, foundation layouts, structural details, and mechanical, electrical, and plumbing diagrams showing routing, capacities, and coordination notes to avoid clashes and meet code and facilitate inspector sign-off.
Written technical requirements, product data, performance criteria, and quality-control processes that complement drawings and establish procurement, submittal, and testing obligations for contractors, including inspection and acceptance procedures.
| Form Field and Workflow Configuration | Admin-set value and behavior for each field |
|---|---|
| Signer Order and Authentication Method | Sequential or parallel routing; email, SMS, or KBA |
| Field Types and Validation Rules | Text, date, amount, checkbox; use regex and ranges |
| Conditional Logic, Visibility and Automation | Show or hide fields based on role or value |
| Export Formats and Naming Conventions | PDF/A for archives; DOCX or CSV for integrations |
Ensure platform compatibility for file formats, integrations, and authentication before eSubmission to prevent failed uploads, format errors, or reviewer rejection during permit review.
Submit full permit set prior to municipal application cutoff.
Issue bid packages and allow at least 14 to 21 days for responses.
Expect four to twelve weeks depending on jurisdiction and completeness.
Begin mobilization after permits issued and contract executed.
Provide as-built drawings and warranties within the contract closeout window.
A mid-sized municipal library renovation used a coordinated project set to consolidate structural, MEP, and accessibility documentation for permit review.
A developer used a complete Architectural Project Set to standardize unit layouts, roof assemblies, and material specifications across three building types for a phased construction program.