Establishing secure connection…Loading editor…Preparing document…

Asbuilt Drawings Template

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Asbuilt Drawings Template

Project Name:    Project Number:

Property Identification

Prepared By / Record Drawings

Licensed Professional:    License No.:

Contractor / Engineer

Drawing Index (Record Drawings)

List each drawing sheet, sheet number, scale and brief description. Provide electronic file reference in attachments.

Revisions / Field Changes Log

Revision Date:    Revised By:

As-Built Conditions and Deviations

The following summarizes deviations from the approved construction drawings, reason for deviation, and field verification method.

Utility Verification

For each utility indicate verification status and provide as-built conduit/elevation/location information on drawings.

Water: Verified    Sewer: Verified    Gas: Verified    Electric: Verified    Storm: Verified

Materials, Finishes and Dimensions

Attachments and Deliverables

Certification by Licensed Professional

I, the undersigned licensed professional, hereby certify that the attached record/as-built drawings accurately represent the field-verified conditions of the improvements described herein to the best of my knowledge and were prepared under my direct supervision. The drawings reflect measured dimensions, elevations, and locations observed during field verification. This certification does not constitute a warranty as to future performance of the improvements.

Delivery and Acceptance

Record drawings and supporting documentation are delivered to Owner as follows. Owner acceptance is acknowledgement of receipt and review of as-built documentation; acceptance does not waive latent defects or future discovery of discrepancies.

Owner Acknowledgement: Owner has received and reviewed the as-built drawings and attachments.

Liability, Indemnity and Governing Law

The preparer and certifying professional shall perform services consistent with applicable professional standards. Owner accepts that opinions and measurements set forth are professional determinations based upon field verification at the time of observation. To the fullest extent permitted by law, the parties agree to indemnify and hold harmless each other from claims arising from their negligence. This document shall be governed by the laws of the state in which the property is located.

Representations and Entire Agreement

This document, together with referenced drawings and attachments, constitutes the entire record drawing submission and supersedes prior as-built transmittals for the items and scope described herein. Any amendment must be in writing and signed by both parties.

Owner / Recipient:

By:

Date:

Preparer / Certifying Professional:

By:

Date:

Enter text✕

What an Asbuilt Drawings Template Is and When It’s Used

An Asbuilt Drawings Template is a standardized document used to record the final, installed conditions of a building, infrastructure, or site after construction is complete. It captures measured changes from original design drawings, including updated dimensions, materials, equipment locations, utilities, and site features. Project teams, owners, permitting authorities, and facility managers use as-built drawings for facility operations, maintenance, future renovations, and to close permits. Accurate as-built records reduce rework, speed troubleshooting, and form the authoritative reference for change orders, warranties, and regulatory inspections.

Why Use a Standardized Asbuilt Drawings Template

A consistent template ensures completeness, improves accuracy, and creates a single source of truth for final construction conditions. Standardization reduces disputes, streamlines permitting and closeout, and makes the record usable for operations, future design, and code compliance.

Why Use a Standardized Asbuilt Drawings Template

Who Typically Prepares and Uses Asbuilt Drawings

Typical preparers include contractors, subcontractors, surveyors, design consultants, and BIM technicians who document field changes and measured conditions.

  • General contractors and superintendents documenting change orders and installed work for project closeout
  • Surveyors and BIM technicians producing accurate field-measured geometry and 3D model updates
  • Owners and facility managers using final records for maintenance, warranties, and renovation planning

Owners, facility managers, local permitting agencies, and future design teams rely on the finalized as-built set for operation, compliance, and renovation planning.

Essential Sections to Include in a Professional Template

A usable asbuilt template organizes metadata, drawings, revisions, notes, and approvals so stakeholders can find authoritative information quickly during operations and audits.

Cover Sheet

Project name, owner, project number, drawing index, revision list, and a brief description of scope and deliverables for the as-built package.

Drawing Revisions

Clear revision clouding, revision table with dates, and a concise description of each field change so changes are traceable to change orders and RFIs.

Field Notes

Measured dimensions, offsets, elevations, material changes, and field-observed conditions recorded with date, measured by, and method used.

Equipment & Systems

Updated locations and serial numbers for mechanical, electrical, and plumbing equipment plus as-installed routing for conduits and piping.

Legend & Scale

Drawing scale, legend of symbols, and coordinate system or datum to ensure later measurements and overlays align correctly.

Approval Block

Signature, printed name, role, organization, and date for the person certifying the as-built set as accurate.

Security and Compliance Considerations

Encryption: TLS 1.2/1.3 in transit
Data at Rest: AES-256 encrypted storage
Certifications: SOC 2 Type II available
HIPAA: BAA required for PHI
Audit Trail: Comprehensive action logs
Accessibility: WCAG 2.0 Level AA

Step-by-Step: Completing the Asbuilt Drawings Template

Follow these steps to create reliable as-built records that stand up to review and use.

  • 01
    Collect Field Data: Record measurements and photos on site.
  • 02
    Update Drawings: Apply measured changes to master CAD/BIM files.
  • 03
    Review & Verify: Cross-check dimensions and system routing.
  • 04
    Approve and Submit: Sign, date, and route to owner and permitting agencies.

Recommended Digital Workflow Settings for Asbuilt Submission

Configure a simple digital workflow to collect signatures, preserve audit trails, and distribute final as-built sets to stakeholders.

Field Configuration
Document Format PDF/A for long-term archival
Signer Authentication Email plus SMS or ID check for contractors
Audit Trail Enable IP, timestamp, and version history
Distribution Send copies to owner, design team, and permitting authority

How Digital Submission and eSigning Typically Works

A streamlined process reduces delays and ensures a verifiable record of approvals for the as-built package.

  • Upload Files: Attach drawing PDFs or BIM exports
  • Add Fields: Place signature, date, and text fields
  • Invite Signers: Email or share secure signing links
  • Capture Audit Trail: Record timestamps, IPs, and actions

Platform and File Requirements for eSubmission

Ensure your platform supports the formats, integrations, and security controls required for as-built delivery.

  • File Types: PDF, DOCX, DWG exports supported
  • Integrations: Connectors for Procore and Box
  • Security Controls: Role-based access and audit logs

Verify compatibility with project management and document control systems to maintain traceability and ease distribution during closeout.

Penalties and Risks If the Asbuilt Set Is Incorrect

Recording Delays: Permit or title holds
Contract Disputes: Change order and claim risk
Insurance Denial: Claims may be contested
Cost Overruns: Remediation and rework costs
Regulatory Noncompliance: Fines or corrective orders
Warranty Issues: Liability for hidden defects

Common Preparation Mistakes to Avoid

  • Failing to mark revision clouds or change notes, which makes it hard to distinguish original design from as-built conditions and leads to confusion during maintenance.
  • Using inconsistent naming conventions or drawing numbers that cause misfiling and prevent reliable cross-references between drawings, permits, and contract documents.
  • Recording approximate measurements instead of verified field dimensions; estimates can invalidate fabrication, retrofits, and spatial coordination tasks later.
  • Not capturing or attaching photographic evidence and measured point data, which weakens dispute resolution and increases verification time for owners and inspectors.

Real-World Examples of Asbuilt Documentation Use

The examples below show how final as-built records support operations, compliance, and dispute resolution on real projects.

Martin Properties

A mid-size property manager required comprehensive as-built sets for portfolio handover and maintenance planning.

  • Field teams measured and updated BIM and 2D sheets at project closeout.
  • "I can process and execute all of these documents online with 100% compliance and built-in security. Whether on mobile or working offline, I can get forms back to their necessary parties efficiently."

BIS Construction

A contractor used precise as-built records to resolve a dispute over installed utilities.

  • Surveyed coordinates and dated field notes were attached to the drawings.
  • "We felt most comfortable with airSlate SignNow given their SOC 2 certification and strict focus on ESIGN and UETA act compliance."

Practical Tips for Accurate and Efficient Asbuilt Delivery

Follow consistent procedures during fieldwork and digital handoff to minimize rework and support long-term asset management.

Use a Single Source of Truth
Maintain one authoritative set of files (BIM or CAD) and treat updates as controlled revisions. Lock previous versions with change logs to preserve provenance and support audits.
Standardize Naming and Versioning
Adopt a project-wide naming convention and include revision, date, and author in file names. Standardization reduces search time and prevents mismatches during coordination or permitting.
Include Measured Point Data
Attach GNSS or total station point exports and photos with scale references. Raw measurement data supports verification and downstream fabrication or retrofit work without resurveying.
Preserve a Verifiable Approval Trail
Capture signer identity, timestamps, and approval notes. When notarization or witnesses are required, use compliant notarization workflows and retain certificates and recordings.

eSignature Vendor Comparison for Asbuilt Drawing Workflows

Comparison of common eSignature vendor price points and core capabilities relevant to as-built drawing approvals and distributed sign-off workflows.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Yes Yes Yes Yes
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Timing Considerations and Typical Submission Points

Asbuilt drawings integrate with project milestones and permitting; timing affects inspections, warranties, and final payments.

Project Closeout:

Submit final as-builts at formal closeout per contract requirements

Permit Finalization:

Provide updated drawings when closing building permits or requesting final inspections

Warranty Handover:

Deliver as-built set to owner at warranty start to support maintenance

Lien Release:

Attach as-built documentation when processing lien waivers as required

Recordation:

Record plats or easements with county recorder if required by jurisdiction

FAQs and Troubleshooting for Asbuilt Drawings

Answers to common questions about preparing, signing, and storing as-built drawings in digital workflows.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users