Scope of Work
Describe precise installation tasks, site locations, connection points, and any excavation or restoration responsibilities, including materials and manufacturer-specified installation methods to avoid ambiguity.
A clear agreement reduces regulatory risk, assigns ongoing maintenance responsibility, preserves inspection evidence, and documents timing and payment expectations for installers, owners, and utilities.
Use the agreement when you need enforceable, auditable documentation that ties device performance, inspections, and payments to named parties.
A facility manager or property owner signs to accept long-term maintenance obligations and to authorize access for testing; they must ensure permits and utility notifications are completed and payments are made on schedule.
A licensed plumber or certified tester signs to confirm the device was installed according to manufacturer and municipal specifications, to supply serial numbers and test results, and to warrant workmanship for any agreed warranty period.
Maintain a tamper-evident signed PDF plus exportable audit logs; ensure chosen platform supports required authentication and retention options.
| Field | Configuration |
|---|---|
| Signature Authentication | Email + SMS code |
| Required Attachments | Permit copy | Device manual | Test report |
| Conditional Fields | Show warranty if owner selects paid option |
| Audit Trail Settings | Capture IP, timestamp, and signer email |
Describe precise installation tasks, site locations, connection points, and any excavation or restoration responsibilities, including materials and manufacturer-specified installation methods to avoid ambiguity.
List manufacturer, model, serial number, calibration settings, and pre-installation condition to tie physical hardware to the contract and future test records for traceability.
Specify which permits the installer will obtain, the inspection schedule, who pays permit fees, and the process for scheduling municipal inspections and corrective actions if needed.
Define post-installation test procedures, acceptable pass/fail thresholds, required certified tester signature, and deadline for submitting test reports to the utility.
Assign ongoing maintenance duties, inspection intervals, emergency response obligations, and which party bears the cost of routine service or corrective repairs.
Allocate responsibility for property damage, code violations, and third-party claims; include insurance minimums and warranty period to limit disputes and ensure coverage.
Apply and obtain permits before work; timelines vary by municipality.
Complete performance testing within 30 days of installation unless the permit specifies otherwise.
Submit test reports to the utility within 10 business days after certification.
Many jurisdictions require yearly retest and certification; check local code for exact interval.
Allow time for reinspection if initial tests fail; contractor should schedule promptly.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies | Varies |
Tim uses digital signing for field service documentation to eliminate paper delays.
Brian adopted eSignatures to simplify customer-facing compliance paperwork.
Submit permit application and receive approval to schedule work.
Complete physical installation and record device identifiers.
Certified tester completes test and signs certification form.
Submit documents; utility issues final acceptance or requests corrections.