Site Details
Exact room dimensions, ceiling height, door swing, window locations and existing finish conditions to avoid layout conflicts during design.
A complete Bathroom Design Questionnaire shortens planning time, reduces change orders, and clarifies regulatory and accessibility needs for contractors and designers. Accurate answers improve estimate accuracy and support permit-ready documentation.
Clear ownership of who completes each section reduces follow-up questions and speeds approvals from trades and local permitting offices.
Exact room dimensions, ceiling height, door swing, window locations and existing finish conditions to avoid layout conflicts during design.
Existing drain/waste/vent locations, supply lines, water heater location, and any proposed fixture relocations that affect permit scope.
Panel capacity, existing circuits, planned lighting and fan locations, and requirements for heated floors or high-load appliances.
Preferred fixtures, finishes, tile sizes, shower type, vanity dimensions, storage needs and any brand or performance preferences.
Mobility needs, grab bar locations, clearances for wheelchair access, and compliance considerations for ADA-style installations.
Target budget range, phased work preferences, desired start date, and any hard completion deadlines affecting scope or materials.
| Field | Configuration |
|---|---|
| Room Dimensions | Numeric fields with units and required validation |
| Photo Upload | Allow JPEG/PNG up to 10 MB |
| Conditional Fields | Show plumbing fields if relocation selected |
| Routing | Send completed form to designer and contractor |
Ensure the chosen system preserves an audit trail, supports the e-signature legal test, and can export signed records for permits or contractor files.
Save a signed, flattened PDF that includes signature images and an embedded audit trail for submission to permitting authorities or for contractor recordkeeping.
Download an editable DOCX copy when you need to make further revisions or generate a new version based on an approved design.
Export structured field responses to CSV for importing into estimating, CRM, or project management systems for bulk processing.
Store completed questionnaires in Google Drive, Box, or other integrated repositories so project teams have consistent access.
2–4 weeks for typical remodels
Submit once drawings and scope are finalized
Local review commonly 2–8 weeks
After permit issue and contractor scheduling
Midwork and final inspections per code
Martin Properties standardized intake with an online questionnaire to reduce site visits and speed approvals.
A healthcare operator adopted digital forms to manage facility modifications and consent workflows.
The property owner or authorized agent must sign to approve scope, budget, and contract terms. If the owner is not present, a written authorization or power of attorney may be required for binding approvals.
A licensed designer or architect signs professional portions such as plans and technical exhibits. Their signature may be required on permit drawings in jurisdictions that demand licensed professional oversight.
Collect measurements, photos, and utility details to build the design brief.
Finalize layout and fixtures and obtain client sign-off on scope and cost.
Prepare and file permit documents with local authority having jurisdiction.
Begin work after permit issue and complete required inspections for code compliance.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |