Parties & Recitals
Identify the owner, installer, utility, and any aggregator; summarize the project and program under which export credits will be issued, including tariff or program name and reference to the interconnection application.
A clear Battery NEM Agreement protects parties by assigning responsibilities for interconnection, metering, export compensation, data sharing, maintenance, and safety. It reduces disputes over credits, clarifies revenue flows from exported energy, and documents required certifications and inspections so projects can move from commissioning to steady operation with predictable treatment under the utility tariff.
The agreement is completed by the system owner or developer, often with assistance from the installer and utility account manager.
Parties should verify signatory authority, interconnection requirements, and any program-specific forms required by the enrolling utility before signing.
Typically the retail customer on the utility account; responsible for consenting to interconnection, permitting access to meters and batteries, and accepting billing credits or charges per the agreement.
Installs and commissions the battery system, certifies equipment and safety compliance, assists with the interconnection application, and may provide ongoing maintenance or monitoring under the contract.
Identify the owner, installer, utility, and any aggregator; summarize the project and program under which export credits will be issued, including tariff or program name and reference to the interconnection application.
Specify battery make/model, nameplate kW and usable kWh, inverter details, telemetry requirements, and any site constraints that affect operation or dispatch.
State whether export is measured at the retail meter or a separate meter, how credits are calculated, timing of settlement, and any cap on exported energy or credits.
Allocate responsibility for interconnection application, permitting, protective relays, anti-islanding, and compliance with utility technical requirements and inspection protocol.
Define telemetry and meter data required, who may access it, retention, and any HIPAA or data-protection obligations when health-related or third-party data are present.
Set the agreement term, conditions for transfer on property sale, early termination mechanics, and remedies for breach or persistent noncompliance.
| Field | Configuration |
|---|---|
| Owner Details | Use exact name and account number |
| System Attachment | Upload datasheets and permit scans |
| Signature Order | Specify signer sequence for owner, installer, utility |
| Notifications | Enable email/SMS for status updates |
Use an eSignature platform that supports audit trails, PDF output, and optional stronger signer authentication for utility or regulatory requirements.
Confirm the utility accepts electronically signed agreements and whether a notarization or witnessed signature is required before submission.
Utility review often 2–8 weeks depending on backlog
May require studies; 2–12 weeks for complex sites
Schedule local inspection; typical window 1–4 weeks
If needed, utility installs new meter in 1–6 weeks
Permission to operate issued after all approvals
Send agreement, equipment specs, and permits to utility
Utility confirms safety, grid impact, and metering needs
Complete installation and pass the local inspection
Utility issues final permission and begins crediting
Include manufacturer spec sheets in PDF to confirm nameplate kW/kWh and inverter certifications
Upload local permits and passing inspection reports as PDF or image files
Attach completed utility application and any required fees or proof of payment
Download the fully executed agreement as a PDF with audit trail for retention
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |