Establishing secure connection…Loading editor…Preparing document…

BC Hydro Declaration Form

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Overhead Residential Services – Reference Guide & Declaration

Revised: December 2012

CUSTOMER REFERENCE GUIDE - OVERHEAD RESIDENTIAL SERVICES

The Canadian Electrical Code specifies that the supply end of a service shall be installed in a location satisfactory to both the Electrical Inspection Department and the Supply Authority (BC Hydro). The service connection point must allow BC Hydro ease of service installation, maintenance and meter access at all times. All necessary clearances over garage roofs, decks, balconies and near stairs and windows must be provided in order to accommodate the BC Hydro requirements for service connections and maintenance and for meter access. The attached Declaration must be submitted to BC Hydro before applying for energization. The following summarizes BC Hydro requirements with respect to overhead services and meters.

Service Heights (ES 43 B1-11)

The contractor/customer is responsible for providing a point of attachment that meets the requirements of the Canadian Electrical Code and BC Hydro. The point of attachment shall not exceed 7 meters, (over 7 m requires written permission from BC Hydro), above grade or sidewalk, and shall be located such that the clearance of supply conductors at any point above finished grade shall be not less than the following. Note that BC Hydro clearance requirements are generally greater than Code requirements.

a) Across highways, freeways, and expressways: 7.1 m

b) Across streets, lanes, alleys and pipeline ROW: 5.5 m

c) Across driveways to commercial and industrial premises: 5.5 m

d) Across driveways to residential garages: 4.5 m

e) Across ground normally accessible to pedestrians only: 3.5 m

Sufficient horizontal clearance must be available at grade level between the foot of a ladder and its resting-place on the building to meet BC Hydro and Work Safe BC regulations. This must allow the installation to be done safely, by our installer, using an extension ladder without the ladder encroaching on the neighbor’s property (ladder slope 4:1).

Service Location

The location of the service entrance (wire holder) shall be:

1. In a direct line of sight with BC Hydro’s service pole, and

2. On the wall of the building facing the power supply; or

3. Not further than 1 metre (3 feet) back, from that wall, on either side;

If a roof mast is required to meet the minimum vertical clearance above grade, it MUST be located within 45cm (18 inches) from the edge of the roof within reach of installer’s ladder. Rain gutters must be reinforced to be capable of holding weight of installer on the ladder without damage to gutter.

If you cannot meet the requirements of the preferred service location, please contact our Service Representative by calling 1-877-520-1355 during the hours of 8:00 AM to 4:00 PM (Pacific Standard Time).

Service Length

The maximum service length from a Hydro pole to the customer’s point of attachment is 30 metres (100 feet). If the service length exceeds 30 meters and is approved by BC Hydro, an extra length wire charge will apply. An intermediate pole may be required.

Tree Clearance (ES 64- D2)

It is required that trees be cleared to 3 metres on each side of any secondary conductor.

Service to Garages and Private Property Poles

Service connections to garages or private property poles may help to alleviate problems resulting from clearances and other Hydro, WCB and Electrical Code requirements. Meters are permitted on poles and garages but must not project onto public property. All garage and pole installations must conform to all applicable criteria for service height, location, length and meter location etc. Confirm other requirements with local inspection authority.

RESERVED IN-SERVICE DATE WILL NOT BE HONOURED UNLESS ALL INFORMATION IS COMPLETE. ANY DEFICIENCIES/DISCREPANCIES AT THE TIME OF CONNECTION WILL RESULT IN A CALL-BACK CHARGE.


METER INFORMATION - GENERAL

Only one service connection (or “supply service” per the Canadian Electrical Code) will be provided to a residential dwelling.

Type of Dwelling Number of Meters
House – one SFD 1
House with a suite – two SFDs 2
Duplex – two SFDs 2
Triplex – three SFDs 3
Four Plex-Four SFDs 4

Meter Location – For latest requirements, visit the BC Hydro website at www.bchydro.com; New and existing electrical connections; Forms and Guides, and under Revenue Metering Requirements, select: Requirements for Secondary Voltage Revenue Metering (750 V and less).

All residential socket type meters shall be installed within 1.0 m (1000 mm) and have unobstructed clearance in front of BC Hydro’s meter for clear and safe access at all times for BC Hydro representatives. Meters must be installed between 1.5m and 1.8m above finished grade. Meters shall not be installed inside carports, garages, breezeways, or any part of the structure that may potentially be enclosed or within 1.0 m of a gas meter.

MID SPAN-TAPS ARE NOT NORMALLY ALLOWED. FOR MORE INFORMATION PLEASE CONTACT YOUR LOCAL SERVICE REPRESENTATIVE, 1-877-520-1355 DURING THE HOURS OF 8:00 AM TO 4:00 PM, PACIFIC STANDARD TIME.

SOME COMMON REASONS FOR SERVICE REJECTION

(1) Trees on public and private property must be clear by 3 meters on each side of any secondary lines

(2) Service wire too low over garage roof (Min height is 3.5m)

(3) Service wire too low over balcony (Min height is 3.5 m)

(4) Length of service wire is more than 30M (100 feet) from pole to attachment point. An intermediate pole may be required.

(5) Point of attachment is on wrong side of house

(6) Ladder cannot be used, stairs interfere here (lot line is too close to house).

(7) Mast too far back to reach from ladder (over 45cm, 4:1 ratio ladder slope)

(8) Meter base too close to lot line for access (distance must be 1m or greater)

(9) Meter base is installed higher or lower than the required specifications (min 1.5m., max 1.8m above finished grade)

OVERHEAD ELECTRICAL SERVICE DECLARATION

Note: The owner must apply for service by calling 1-877-520-1355 before service at this location can be scheduled for energization.

SITE PLAN

Pole ID #

*The pole identification number is found on a yellow or gray rectangular tag located on the pole approximately 6 feet from the ground. Enter all numbers from the tag on the above line.

Please indicate:

- North arrow

- Streets, lanes, lot number

- Building in relation to your property lines

- Closest BC Hydro pole(s)

- Service entrance location on structure

SERVICE CHARACTERISTICS

120/240 volts, amps Mainswitch (bus rating if multiple meter base)

Heat Source:

List total load for each of the following as applicable:

1) ELEC Baseboard kW   2) ELEC Forced Air Furnace kW

3) ELEC Hot Water on Demand kW   4) Heat Pump kW

Total Service wire length to pole: m

Service Entrance height from ground: m

Service Entrance height shall not exceed 7 meters (over 7 m requires written permission from BC Hydro)

DESCRIBE SERVICE LOCATION

1) Service from pole is on same side OR is on the opposite side

2) Of the Street OR Lane

Service Requirements for Overhead Residential Services:

The new electrical service connection point is in accordance with the Reference Guide (see page 1)

The meter base location is in accordance with the Reference Guide

The proposed service wires have the required minimum height clearance in as per the Reference Guide

Trees on private and/or public property adjacent to the proposed service wire path have been trimmed in accordance with the Reference Guide

The service address is affixed to the house or posted at driveway

The main switch is to be in the “OFF” position after request for energization has been made

1. This declaration does not constitute an authorization for connection. An Electrical Safety Act – Contractor Authorization Form must be received before an order for connection is released.

2. The installation shall comply with the Canadian Electrical Code and the amending bulletins issued by the Electrical Safety Branch of British Columbia and WCB OH&S Regulations General Hazard Requirements Part 12 and 13 for ladders and fall protection.

3. Any errors, omissions, deficiencies or false information to the above declaration at the time of connection will result in a call-back charge and work being suspended.

I AM THE PERMIT HOLDER AND AGREE TO BE RESPONSIBLE FOR, AND HEREBY CERTIFY THAT THE SERVICE ENTRANCE HAS BEEN INSTALLED TO COMPLY WITH BC HYDRO REQUIREMENTS.

Enter text✕

What the BC Hydro Declaration Form Is and When It Applies

The BC Hydro Declaration Form is a formal written statement used to confirm account details, service eligibility, or declarations related to electric service with BC Hydro. It typically collects identifying information, service addresses, account numbers, declarations of occupancy or ownership, and signature lines. This guide explains the form's purpose, required fields, common mistakes, and how to complete and submit the document electronically in U.S.-centric legal contexts while preserving records according to applicable retention rules.

Why accurate completion matters

Completing the BC Hydro Declaration Form correctly reduces service interruptions, prevents billing misallocation, and ensures the declaration is accepted by the utility or third parties. Accurate information also supports dispute resolution and preserves legal protections for both the customer and the utility.

Why accurate completion matters

Who typically completes this form

The BC Hydro Declaration Form is most often completed by account holders, authorized agents, or property managers who manage billing and service on behalf of occupants or owners.

  • Account holders: Primary customers providing identity, service address, and signature for account actions.
  • Authorized agents: Property managers or representatives submitting declarations with documented authorization.
  • Third-party processors: Contractors or legal representatives completing forms when granted power of attorney or written consent.

Ensure the person signing has the authority to bind the account; retain proof of authorization when an agent or third party submits the form.

Essential parts of a professional BC Hydro Declaration Form

A clear, well-structured form improves acceptance and processing speed. Include required IDs, precise addresses, explicit declarations, and dedicated signature blocks with dates.

Header

Form title and date: identify the form as a BC Hydro Declaration Form and include the document creation date for tracking and retention.

Party Information

Full legal name and contact details for each declarant; match names to government ID to avoid processing delays or identity verification failures.

Service Address

Complete service location: street address, unit number, city, province/state, and postal/ZIP code. P.O. boxes are insufficient for service location.

Account Details

BC Hydro account number, meter number (if available), and prior account references to link the declaration to the correct utility record.

Declaration Text

A concise statement describing the declarant's status or claim (occupancy, ownership, transfer of service) with date and any supporting facts.

Signature Block

Signature, printed name, title (if applicable), and date. Include witness or notary lines when the situation or jurisdiction requires additional authentication.

Step-by-step completion checklist

Follow these sequential steps to complete and submit the BC Hydro Declaration Form accurately.

  • 01
    Gather documents: Collect ID, account statements, and authorization letters.
  • 02
    Fill fields: Enter data exactly as instructed on the form.
  • 03
    Authenticate: Sign, and include witness or notary if required.
  • 04
    Submit: Send to the utility using the designated channel.

How electronic submission typically flows

Electronic submission streamlines routing, provides an audit trail, and allows secure attachments for supporting documents.

  • Prepare: Upload the completed form and supporting attachments.
  • Place fields: Designate signature, date, and checkbox fields where required.
  • Authenticate signer: Use email, SMS code, or stronger methods for signer verification.
  • Transmit: Send to the utility and capture confirmation of receipt.

Suggested online workflow settings for digital completion

Configure your digital workflow to reduce errors and preserve a clear audit trail for each submission.

Field Configuration
Authentication Email+SMS code for most cases; KBA for higher assurance
Conditional Fields Show additional inputs only when specific checkboxes are selected
Verification Attachments Require ID upload and proof of occupancy where needed
Notifications Email confirmation to declarant and account admin

Technical requirements for secure eSubmission

Use a platform that supports standard file formats, secure transport, and an auditable signing record to maintain evidentiary value.

  • File formats: PDF, DOCX supported
  • Integrations: CRM and cloud storage integrations
  • Security standards: TLS and AES encryption

Platforms that provide traceable audit trails, encryption in transit and at rest, and flexible signer authentication simplify compliance with ESIGN/UETA and internal retention policies.

Typical eSignature vendor pricing and capability snapshot

Common eSignature choices differ on price, enterprise features, and compliance; signNow appears first for quick comparison.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial No No Yes, limited Yes, limited
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Security and compliance controls to expect

Transport Encryption: TLS 1.2/1.3
Data at Rest: AES-256 encryption
Audit Trail: Timestamped event history retained
Regulatory Certifications: SOC 2 Type II, ISO 27001
Privacy & Compliance: GDPR and CCPA controls
Health Data: HIPAA support with BAA

Consequences of incorrect or incomplete declarations

Service Delay: Civil rejection or processing delays
Incorrect Billing: Charges applied to wrong account
Disconnection Risk: Service interruption for unresolved disputes
Liability Exposure: Potential civil claims for misstatements
Criminal Risk: Intentional false statements could trigger prosecution
Record Loss: Insufficient retention harms dispute defense

Common mistakes to avoid

  • Using inconsistent legal names across documents, which causes identity verification failures and delays in processing.
  • Entering an incorrect account or meter number, which routes the declaration to another customer and delays resolution.
  • Skipping required attachments such as proof of occupancy or ID, resulting in form rejection or requests for more information.
  • Failing to indicate consent to electronic records where required, which can make e-signed submissions noncompliant in consumer contexts.

Practical tips for accurate and efficient completion

Follow these best practices to reduce friction and preserve legal effect when submitting declarations.

Verify identity and authorization
Confirm the signer is the account holder or an authorized agent and retain written proof of agent authority to prevent later disputes.
Use consistent naming
Enter names and addresses exactly as they appear on ID and account records; consistency prevents mismatches during verification and avoids billing errors.
Prefer electronic submission with audit trail
Submit via platforms that capture signer intent, timestamps, and IP addresses to strengthen evidentiary value under ESIGN (15 U.S.C. ch. 96) and UETA.
Keep complete records
Store signed forms, attachments, and correspondence securely for the required retention period to support audits or disputes.

How the form is used in real situations

These scenarios illustrate typical uses for a BC Hydro Declaration Form and the documentation commonly attached.

Tenant Service Transfer

A tenant completes the declaration to request service transfer effective move-in date

  • Attached ID and lease agreement
  • The utility verifies identity and lease, updates the account, and records the signed declaration as the authorization for billing changes and liability transfer.

Owner Occupancy Declaration

A new homeowner submits the declaration to confirm ownership and request final meter reading

  • Attached deed or closing statement
  • The utility updates ownership records, applies any deposits or credits, and retains the signed form with proof of ownership for compliance and billing audits.

Frequently asked questions about submitting the BC Hydro Declaration Form

Answers below address common technical, legal, and procedural issues encountered when completing or eSigning the form.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users