Project Scope
Detailed description of the beam removal work, locations, dimensions, and any temporary shoring or sequencing required to maintain structural integrity during construction.
A formal approval reduces liability, documents compliance with building codes, and creates an auditable paper trail for insurers, lenders, and municipal authorities. It clarifies who is responsible for design, costs, and inspections while supporting safe structural changes.
Including each party and their contact details on the form speeds permitting and reduces disputes about responsibilities and timelines.
Detailed description of the beam removal work, locations, dimensions, and any temporary shoring or sequencing required to maintain structural integrity during construction.
Licensed engineer or architect stamp and signed calculations showing that the remaining structure meets code; include reference to applicable code edition used for design checks.
Municipal permit number, issuing agency, and any conditions or required inspections that must be completed before covering or final approval is granted.
Contractor name, license number, scope of work, insurance limits, and confirmation of who will perform temporary supports and final installation.
Proof of insurance or bond for contractors and a statement addressing lien waiver expectations or contractor lien rights during and after the project.
Signature blocks for owner(s), licensed professional(s), contractor(s), and municipal inspector with printed name, title, and date for each signatory.
| Field | Configuration |
|---|---|
| Signer Order | Owner → Engineer → Contractor → Inspector |
| Authentication | Email link with SMS code or two-factor for professionals |
| Required Fields | Make engineer stamp and permit number mandatory |
| Retention | Store signed copy and audit trail for the retention period |
Use a platform that provides tamper-evident signed PDFs, search-friendly archives, and role-based access controls for project stakeholders.
3–14 business days depending on workload
2–8 weeks for municipal review on average
Scheduled within 3–10 business days after request
2–4 weeks after work completion
Store executed approval immediately upon signing
File permit and approval documents with the building department.
Engineer completes calculations and issues sealed drawings.
Municipality issues permit and posts conditions for inspection.
Inspector verifies work and signs off the approval.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |