Project Overview
Project scope, site address, owner contact, and a concise statement of work that frames all technical requirements and constraints for bidding and permitting.
A well-prepared Building Requirements Document reduces permitting delays, clarifies contractor scope, and lowers rework risk by consolidating code citations, materials, and performance criteria into one authoritative source.
Several roles create or rely on a Building Requirements Document during planning, permitting, and construction.
Clear ownership and distribution records ensure the right stakeholders review and accept the requirements at each milestone.
Project scope, site address, owner contact, and a concise statement of work that frames all technical requirements and constraints for bidding and permitting.
List applicable building, fire, accessibility, energy, and mechanical codes with section references and the edition year used to confirm inspection and approval standards.
Detailed material, assembly, and performance standards for structural, electrical, mechanical, and finish systems including tolerances and testing requirements.
Municipal permit checklist, required attachments, special inspections, plan review conditions, and any agency-mandated studies or reports.
List of referenced drawings and exhibits with revision numbers, sheet indexes, and which drawings satisfy specific permit checklist items.
Signatory block, responsible parties for submittals and inspections, and escalation contact points to resolve code interpretation or field change issues.
| Field | Configuration |
|---|---|
| Document Owner | Assign a single owner to manage versions and track signoffs. |
| Review Order | Set sequential reviewers: architect → engineer → owner → contractor. |
| Required Attachments | Lock submission until drawings, reports, and specs are attached. |
| Notifications | Enable email and SMS alerts for pending approvals and overdue tasks. |
Choose a platform that supports the file formats and authentication levels required by reviewers and signers.
Ensure the chosen system captures an audit trail, stores signed PDFs in ISO-compatible formats, and meets any regulatory authentication needs.
Allow 7–21 days for internal coordination and redline resolution before filing.
Municipal review typically 15–60 days depending on jurisdiction and project complexity.
Issue occurs after plan approval and payment of fees; timeline varies widely by agency.
Schedule inspections with sufficient lead time; expect 3–10 business days depending on workload.
Final inspection and certificate of occupancy typically follow successful inspections and remediation of punch items.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Tim Martin, Founder, Martin Properties
Brian Fitzgibbons, COO, Optica Ventures LLC