Header
Supplier name, purchase order number, part number, serial or lot numbers, and inspection date so records are unambiguous and searchable.
A precise Business FAI Form reduces ambiguity about acceptance criteria, speeds resolution of defects, and creates an auditable record for contractual obligations. It helps allocate responsibility, supports invoice release decisions, and lowers the risk of downstream rework or warranty disputes.
Typical users include quality engineers, receiving inspectors, vendor representatives, and contract managers responsible for acceptance decisions.
The form must be signed by authorized parties; see the 'Who Has Authority to Sign' and 'Notarization and Witness Requirements' sections for role-specific guidance.
Supplier name, purchase order number, part number, serial or lot numbers, and inspection date so records are unambiguous and searchable.
Reference to drawings, specifications, and tolerance limits with clause citations so measured values can be evaluated against contract requirements.
Tabular fields for dimension, measured value, measurement method, and inspector initials to maintain traceable evidence of inspection.
Clear description of defects, severity, disposition (rework/repair/reject), and required corrective actions with responsible party and due date.
Pass/fail or conditional acceptance checkbox and required references to QA hold tags, quarantine locations, or shipping instructions.
Designated signer names, titles, signature lines and signature dates to confirm review and acceptance or to document escalation steps.
| Field | Configuration |
|---|---|
| Part Number | Required, single-line text |
| Measurement Table | Repeatable table with units |
| Disposition | Radio buttons: Pass / Conditional / Fail |
| Signers | Sequential routing with signer roles |
Choose a platform that supports secure authentication, a tamper-evident audit trail, and exportable signed PDFs.
Ensure the chosen provider can meet contract or regulatory requirements such as HIPAA, 21 CFR Part 11, or customer-specific strong authentication.
Complete within 7 calendar days of delivery.
Supplier to respond within 14 days of notice.
Schedule within 7 days after correction.
Invoice release on formal acceptance date.
Keep inspection records until warranty expires.