Measurements
Include dry film thickness readings with locations, instrument make and model, calibration date, individual readings, averages, acceptance criteria mapped to contract specifications, and inspector initials for each measurement.
A Coating Inspection Report establishes objective evidence that coating systems complied with contract specifications, supports warranty claims, reduces rework, and documents safety and environmental conditions. Accurate reports minimize disputes and provide contractors, owners, and insurers with a defensible audit trail.
Common users include quality inspectors, contractors, project managers, and owners responsible for coating performance and compliance.
Reports support contract closeout, warranty claims, regulatory compliance, and long-term maintenance planning across multiple stakeholders.
As Lead Inspector, you record field measurements, operate or calibrate test equipment, sign off on nonconformance reports, and communicate corrective actions to contractors and owners. Your entries provide the chain of custody for inspection evidence and may be reviewed during warranty or dispute resolution.
As Project Manager, you use the Coating Inspection Report to verify milestones, approve releases for subsequent trades, confirm compliance with specifications, and archive inspection records for contract closeout. Accurate reports reduce rework, schedule delays, and exposure to warranty disputes.
Include dry film thickness readings with locations, instrument make and model, calibration date, individual readings, averages, acceptance criteria mapped to contract specifications, and inspector initials for each measurement.
Attach high-resolution photos with location tags, date/time stamps, and captions describing observed defects, surface condition, or verification of prepared areas to support measurements and corrective action items.
Reference applicable standards and contract clauses (SSPC, NACE, ASTM, or project specifications), including required tolerances and acceptance criteria for each inspection parameter and testing method descriptions.
Document each nonconformance with location, severity, recommended corrective steps, responsible party, completion target date, and verification criteria for acceptance after remedial work, and reference photos and readings.
Include printed name, title, company, signature, and signature date for all signatories; include contact information and indicate whether signature is on behalf of an entity.
Provide electronic audit trail entries showing each action, signer IP address, timestamps, and any authentication steps used to verify identity and consent for the electronic signature.
| Field | Configuration |
|---|---|
| Inspector Authentication | Email link or SMS code; SSO optional |
| Conditional Fields | Show repair fields when nonconformance selected |
| Photo Requirement | Require minimum two photos per failed area |
| Distribution | Auto-send PDF to owner, contractor, and insurer |
Choose a platform that handles PDF and DOCX imports, mobile capture, and integrates with project or cloud systems.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Tim Martin, founder of Martin Properties, digitized inspection forms and signatures to streamline on-site coating inspection workflows and approvals.
Dan Rotelli, CEO of BIS, adopted digital inspection workflows to centralize records and standardize reporting across multiple project sites and subcontractors.
Complete inspections within the agreed coating cure window
Submit final report within contract-specified days after inspection
Address nonconformances by the date stated in report
File defects with owner within warranty notice period
Allow curing time before retesting per coating manufacturer
Contractor schedules inspection at required surface prep stage
Inspector measures DFT, adhesion, and continuity tests
Compile findings, nonconformances, and recommended repairs
Owner or inspector signs acceptance or documents rejection