Scope of Work
Describe exact locations, surface areas, substrate types, exclusions, and deliverables so both parties agree on what is included and what constitutes extra work.
A Coatings Agreement reduces ambiguity about materials, methods, schedules, and warranty obligations. Written terms help manage technical risk, set objective acceptance tests, and protect both applicators and owners when workmanship, environmental exposure, or product performance are in dispute.
Typical users who prepare and sign Coatings Agreements include contractors, coating manufacturers, facility owners, and project managers.
These documents are common across construction, maintenance, manufacturing, and specialty contracting where coatings affect durability, safety, and appearance.
The facility owner or designated manager typically approves scope, accepts completed work, and signs for final payment. Their signature confirms acceptance criteria were met and activates warranty obligations; they should verify project specifications and vendor certifications before signing.
An authorized representative of the coating supplier signs to confirm product specifications, installation guidance, and warranty terms. The signer should be able to bind the company and include printed name, title, and date alongside the signature.
Describe exact locations, surface areas, substrate types, exclusions, and deliverables so both parties agree on what is included and what constitutes extra work.
List manufacturer, product names, SSPC/NACE or ASTM standards, batch numbers when available, required dry film thickness, and environmental application limits.
Specify blasting, cleaning, repair, and profile requirements, plus methods of measurement and acceptable tolerances prior to coating application.
Define objective tests (e.g., DFT, adhesion, holiday testing), test methods, frequency, and who performs inspections and acceptance testing.
State unit pricing, milestone payments, retainage, payment schedule, invoicing requirements, and consequences for late payment or nonpayment.
Specify warranty duration, start date trigger, maintenance obligations to preserve coverage, and remedies or corrective actions for defects.
| Field | Configuration |
|---|---|
| Template Name | Coatings Agreement standard template |
| Signing Order | Sequential signer order with roles |
| Authentication Level | Email link plus optional SMS code |
| Required Attachments | Manufacturer SDS and technical data sheets |
Coatings Agreements benefit from platforms that support PDF, DOCX, field validation, attachments, and robust audit trails for electronic signing.
Enter start date in MM/DD/YYYY format.
Specify start and expected number of application days.
State dates for testing and required documentation submission.
Set inspection window and acceptance criteria for each area.
Define warranty commencement and length in months or years.
Confirm substrates, mock-ups, and product approvals before mobilization.
Complete cleaning, repairs, and environmental protection measures prior to coating.
Execute coats per specification and monitor ambient conditions during cure.
Conduct tests, document results, and sign acceptance forms to trigger final payment and warranty.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A plant owner required a detailed DFT and adhesion test protocol before work began.
A property manager specified mock-up approval and weather windows before mobilization.