Project Description
Concise narrative of scope, use, and square footage including change of occupancy details; reviewers use this to determine applicable codes and required reviews.
Submitting a complete Construction Building Permit Application reduces review delays, helps avoid stop-work orders and fines, and documents compliance with local codes. A correct application also establishes inspection schedules and forms the basis for insurance and bonding verifications.
The application is prepared by project owners, licensed contractors, architects, or their authorized agents and then routed to the local permitting office for review.
Depending on local rules, signatures may be required from the property owner, the licensed contractor of record, and in some cases the design professional of record.
Concise narrative of scope, use, and square footage including change of occupancy details; reviewers use this to determine applicable codes and required reviews.
Scaled plan showing setbacks, lot lines, easements, parking, and utilities; required to confirm zoning conformance and to place the structure on the correct parcel.
Architectural and structural drawings sealed as required; include details for foundations, framing, fire-rated assemblies, and energy compliance where applicable.
Signed contractor information, license number, and certificate of liability insurance naming the jurisdiction when requested for validation of responsible parties.
Documentation demonstrating compliance with the applicable building code edition, accessibility standards, and mechanical/electrical/plumbing regulations.
Owner, contractor, and design professional signatures, plus any declarations or affidavits required by local ordinance to certify truthfulness of submission.
| Field | Configuration |
|---|---|
| Authentication | Email or SMS code for signers |
| File Format | PDF/A preferred for plans |
| Attachments | Site plan, drawings, certificates |
| Notifications | Auto-notify applicant on status change |
Confirm supported file formats, authentication strength, and audit trail capabilities before choosing an eSubmission route.
Typically 2–10 business days depending on workload
Ranges widely, often 10–30 business days for full review
Applicant usually has 10–30 days to respond to corrections
Inspections often scheduled within 3–10 business days
Permits commonly expire after 6–12 months without activity
Application and fee are received and logged into the system.
Staff verifies required documents, signatures, and payment.
Discipline reviewers examine structural, MEP, and fire code elements.
Field inspections confirm work matches approved plans and issue final certificate.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes (plan-dependent) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA) | Yes (BAA) | Yes (BAA) | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |