Permits
List permit types, issuing authority, permit numbers, expiration dates, and any conditional approvals; include filing responsibilities and renewal timelines for each permit.
A precise Construction Compliance Code reduces delays, supports consistent inspections, clarifies responsibilities, and lowers dispute risk. Using an eSignature-capable workflow such as signNow can simplify approvals, preserve audit trails, and speed distribution without changing regulatory obligations.
Key project parties prepare or rely on the Construction Compliance Code.
Clear assignment of responsibilities in the Code helps prevent missed filings and supports enforcement of contract requirements.
List permit types, issuing authority, permit numbers, expiration dates, and any conditional approvals; include filing responsibilities and renewal timelines for each permit.
Summarize applicable OSHA and site-specific protocols, PPE standards, post-incident reporting steps, required training records, and the designated safety officer contact.
Specify required insurance lines, minimum policy limits, certificate holders, performance/payment bond amounts, and evidence submission deadlines to the owner.
Document erosion control, stormwater plans, hazardous material handling, required permits, monitoring frequency, and mitigation responsibilities by party.
Define inspection checkpoints, acceptance criteria, testing procedures, responsible inspectors, and how nonconforming work is recorded and remedied.
Detail which records must be retained, retention periods, storage location, and the format (electronic or paper) required for final submittal.
| Field | Configuration |
|---|---|
| Auto-fill | Populate repeated values from templates |
| Conditional Fields | Show fields only when applicable |
| Authentication | Use email, SMS, or stronger methods |
| Audit Trail | Record timestamps, IP, and signer actions |
Ensure your eSubmission platform supports required file types and audit features before distributing the Code.
File before mobilization; lead times vary by jurisdiction
Request inspections within required windows after work completion
Provide updated Certificates before policy expiration
Submit required reports on agreed monthly cadence
Provide documents at project completion for final sign-off
Confirm permits, insurance, safety plan, and Code acceptance
Receive all required permits before site mobilization
Perform scheduled inspections and log outcomes
Obtain completion certificates and close permits
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Martin Properties digitized project compliance to reduce turnaround and track approvals.
BIS prioritized certified audit trails and regulatory alignment across projects.