Construction Concrete Walkway Addendum

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Construction Concrete Walkway Addendum

Parties and Background

Client Name:

Contractor Name:

Project Address:

Original Agreement Date:

WHEREAS

WHEREAS, Client and Contractor entered into a written construction agreement governing improvements at the Project Address referenced above, dated as of the Original Agreement Date identified herein, and

WHEREAS, the parties desire to modify that agreement to add labor, materials, and related work described in this Addendum consisting of the removal of existing surface (if applicable), subgrade preparation, formwork, concrete placement, finishing, curing, and jointing for a concrete walkway; and

NOW THEREFORE, in consideration of the mutual covenants set forth below, the parties agree that the original agreement is amended as provided in this Addendum.

Scope of Work

Specific deliverables include (but are not limited to): excavation and removal of existing materials as required, installation of compacted base and subbase, installation of reinforcement where specified, placement of concrete per specified mix, finishing and curing, joint installation, site cleanup, and protection of adjacent surfaces.

Payment Terms

Additional Contract Amount (for the Scope of Work): $

Payment Schedule:

Invoicing and Final Payment: Contractor will invoice upon completion of the Scope of Work. Final payment is due within days of invoice. Client shall not withhold payment except for bona fide defects or incomplete work identified in writing.

Late Payment: Unpaid amounts will accrue interest at or the maximum amount permitted by law, whichever is less. Client is responsible for reasonable collection costs, including attorney fees, for overdue amounts.

Term and Termination

Commencement Date: Work under this Addendum shall commence on or about , subject to site conditions and receipt of any required permits.

Estimated Completion Date: The Scope of Work shall be substantially completed by , subject to change for excusable delays.

Termination: Either party may terminate this Addendum for material breach if the breaching party fails to cure the breach within days after written notice. Termination shall be without prejudice to remedies that have accrued prior to termination.

Change Orders and Site Conditions

All changes to the Scope of Work, materials, or schedule must be approved in writing by both parties via a signed change order that specifies the change, cost adjustment, and schedule impact. Contractor shall promptly notify Client of unforeseen subsurface or site conditions that materially affect cost or schedule.

Warranties; Insurance; Indemnity

Contractor warrants workmanship for a period of from completion, subject to normal wear and proper maintenance. Manufacturer warranties for materials shall be passed through to Client to the extent assignable.

Insurance: Contractor shall maintain commercial general liability and worker's compensation insurance in amounts customary for the trade and shall provide evidence of insurance upon request.

Indemnity: To the fullest extent permitted by law, Contractor shall indemnify and hold Client harmless from claims, damages, losses, and expenses arising from the performance of the Scope of Work, to the extent caused by Contractor's negligence or willful misconduct.

Confidentiality

Each party shall maintain the confidentiality of the other party's nonpublic information disclosed in connection with this Addendum and shall not disclose such information except as required by law or with the other party's prior written consent. Confidential information does not include information that is publicly available or independently developed without use of confidential information.

Governing Law; Dispute Resolution

This Addendum shall be governed by and construed in accordance with the laws of the State of without regard to conflict of law principles. The parties agree to attempt to resolve disputes in good faith prior to initiating litigation.

Entire Agreement; Effect of Addendum

This Addendum, together with the original Agreement and any prior amendments, constitutes the entire agreement between the parties with respect to the subject matter herein and supersedes all prior negotiations, representations, or agreements, whether written or oral. Except as expressly modified by this Addendum, all terms and conditions of the original Agreement remain in full force and effect.

Miscellaneous

Notices under this Addendum shall be in writing and delivered to the addresses set forth in the original Agreement or as updated in writing. If any provision of this Addendum is held invalid, the remaining provisions will remain in full force and effect.

Client Printed Name:

By:

Date:

Contractor Printed Name:

By:

Date:

Enter text✕

What the Construction Concrete Walkway Addendum Is

A Construction Concrete Walkway Addendum is a contract attachment that clarifies or modifies the original construction agreement to cover concrete walkway work. It defines the exact scope of the walkway (location, dimensions, and finish), materials and mix specifications, unit pricing or lump-sum amounts, schedule impacts, inspection and acceptance criteria, and any additional permits or approvals required. The addendum becomes part of the primary contract once signed by authorized parties and is used to record change orders, cost adjustments, or specific obligations that were not included in the original contract documents.

Why Use a Walkway Addendum

A targeted addendum protects both owner and contractor by documenting agreed changes to scope, cost, timing, and quality standards. It reduces ambiguity that can lead to disputes and provides written authority for payment or schedule adjustments under the original contract and applicable law, including enforceability under the ESIGN Act (15 U.S.C. ch. 96) and state UETA statutes where applicable.

Why Use a Walkway Addendum

Who Typically Prepares and Signs This Addendum

This addendum is used by parties directly responsible for construction delivery and project oversight.

  • General contractors and subcontractors who will perform the concrete work and need to document exact scope and pricing.
  • Project owners or property managers seeking to authorize walkway changes and preserve inspection and warranty terms.
  • Architects, engineers, or project managers who approve technical specifications or sign off on as-built tolerances.

Signatures from authorized representatives finalize the addendum and legally bind the parties to the revised terms.

Core Elements to Include in a Professional Addendum

A clear, well-structured addendum reduces disputes and speeds approvals. Include technical and contractual items that tie directly back to the base contract.

Scope of Work

Precise description of the walkway area, layout, edge conditions, and removal or disposal of existing materials where applicable.

Materials & Specs

Concrete mix design, reinforcement details, cure methods, finish texture, jointing pattern, and any special admixtures or additives.

Dimensions & Layout

Length, width, thickness, slope/grade tolerances, and reference drawings or marked-up plans for exact placement.

Pricing & Adjustments

Unit rates or lump-sum price, allowances, measurement method, and how change orders or unforeseen conditions will be billed.

Schedule & Delays

Start and completion dates, liquidated damages if applicable, weather allowance, and coordination requirements with other trades.

Acceptance & Warranty

Inspection criteria, testing requirements, remedy periods, and warranty duration for workmanship and materials.

Step-by-Step: Completing the Addendum

Follow these steps to prepare, approve, and finalize the walkway addendum so it becomes a binding amendment to the base contract.

  • 01
    Draft Addendum: Define scope, quantities, materials, and pricing with reference to contract section numbers.
  • 02
    Technical Review: Have the architect/engineer or project manager confirm specifications and tolerances.
  • 03
    Signatures: Obtain signatures from authorized representatives and include dates for effectivity.
  • 04
    Distribute Copies: Provide executed copies to owner, contractor, subcontractor, and file with project records.

How to Configure an Online Addendum Workflow

Setting up a digital workflow reduces manual steps and captures an audit trail for approvals and signatures.

Upload Base Contract Attach the original contract or reference its file ID for traceability.
Map Fields Place fillable fields for names, dates, prices, and signature blocks with required/optional settings.
Designate Signers Assign roles (owner, contractor, PM) and specify authentication method for each signer.
Set Notifications Configure email or SMS reminders, expiry dates, and escalation recipients.
Save Template Store the finalized template for reuse on similar walkway projects.

Where to Send the Completed Addendum

Routing completed addenda to the right recipients closes the loop on approvals and ensures enforceable documentation.

  • Owner / Client: Primary recipient for approval, signature, and retention.
  • Contractor File: Keep for payroll, billing, and scheduling records.
  • Project Manager: Holds technical copy for inspection and coordination.
  • Building Department: Submit if permit modifications or inspections require official filing.

Technical Requirements for Digital Completion

Choose a platform that supports the file formats and authentication you need for an auditable record.

  • File Formats: PDF and DOCX accepted; maintain original attachments.
  • Authentication: Email verification or SMS codes for signer attribution.
  • Integrations: Connect to project systems like Procore or NetSuite for document sync.

Ensure the selected provider supports audit trails, exportable signed PDFs, and any compliance addenda needed for your industry.

Essential Information Fields to Include

Project Name: Unique identifier
Owner Name: Full legal name
Contractor Name: Company or individual
Permit Number: If applicable
Work Location: Street, city, state
Effective Date: MM/DD/YYYY

Common Timelines and Deadlines to Track

Track key dates to avoid schedule conflicts, permit expirations, and payment disputes related to the walkway addendum.

Permit Approval Deadline:

Submit revisions within permit expiration window to avoid reapplication.

Work Start Date:

Align with project schedule and notify adjacent trades.

Completion Date:

Establish final completion and punch-list inspection date.

Change Order Response:

Specify number of days to accept or reject a proposed change.

Warranty Start:

State when warranty period begins—usually upon final acceptance.

Common Preparation Mistakes to Avoid

  • Leaving dimensions or tolerances ambiguous, which leads to differing interpretations and payment disputes during installation.
  • Failing to reference the original contract section numbers, making it unclear which terms the addendum amends.
  • Omitting permit or inspection requirements, which can delay occupancy or trigger local code violations.
  • Accepting verbal approvals without signed documentation; verbal agreements are hard to enforce in disputes.

Risks and Consequences of an Incorrect Addendum

Delay Claims: Extended schedules and potential liquidated damages
Cost Overruns: Unapproved work can be unpaid or disputed
Lien Risk: Unpaid subcontractor claims may result in liens
Permit Violations: Fines or stop-work orders from authorities
Contract Dispute: Arbitration or litigation costs
Withheld Payment: Owner may lawfully withhold funds for noncompliance

eSignature Pricing Comparison for Addendum Workflows

Comparison of common vendor pricing and feature availability for executing and managing construction addenda; signNow is shown first per platform data.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial Yes, 7-day trial Yes Yes Yes Yes
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently Asked Questions

Answers to common questions about validity, signatures, notarization, and practical handling of walkway addenda.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users