Cost Plus or Fixed Fee Construction Contract Utah

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

CONSTRUCTION CONTRACT

THIS CONSTRUCTION CONTRACT (“Contract”), effective as of the date of the last party to sign below, is between , having an address at (“Contractor”) and , having an address at (“Owner”).

For valuable consideration the parties hereby agree as follows:

1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work necessary for the completion of the residence, structure, or improvements as described in the drawings and specifications signed by both Owner and Contractor (“Project”) and more particularly described as

Such drawings and specifications are hereby made a part of this Contract. Drawings and specifications shall contain a scale drawing showing the shape, size, and dimensions of the construction and equipment together with a description of the work to be done, materials to be used, and the equipment to be used or installed.

2. WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as (hereafter "the Work Site").

3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before and shall substantially complete the work on or before .

4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price.

5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the Work Site.

6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's risk insurance.

7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor.

8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the drawings and specifications, from time to time during the construction of the Project.

9. CONTRACT PRICE:

{COST PLUS}

Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $ for performing the services set forth in the scope of the work.

Contractor shall be paid as follows:

OR

{FIXED FEE}

Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work.

Contractor shall be paid as follows:

Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due.

10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract.

11. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage.

12. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract, without the other party’s written consent.

13. INTERPRETATION:

(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to supplement one another.

(b) Entire Agreement. This Contract constitutes the entire agreement of the parties.

(c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Utah.

14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs.

15. PERFORMANCE:

(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant this Contract provided Contractor shall remain fully responsible for the proper completion of the Project.

(b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws.

(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.

16. WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope of work performed by Contractor and which arise and become known within one (1) year from the date hereof.

AGREED:

CONTRACTOR:

OWNER:

Enter text✕

Defining the Cost Plus or Fixed Fee Construction Contract Utah

A Cost Plus or Fixed Fee Construction Contract Utah is a written agreement used in Utah construction projects that sets how the contractor is paid: either on a cost-plus basis (reimbursing actual project costs plus an agreed fee or percentage) or as a fixed-fee lump sum. The contract allocates responsibilities, scope of work, change order procedures, and payment timing between owner and contractor. It typically includes project schedule, allowances, retainage, and dispute resolution clauses tailored to Utah law. Parties use this form to clarify pricing risk allocation and to document expectations before construction begins.

Why this contract matters for Utah projects

Use a Cost Plus or Fixed Fee Construction Contract Utah to reduce payment disputes, set clear change order procedures, and allocate cost risk. It provides contractually enforceable terms under Utah law, improving budget predictability and defining remedies for delays or defective work.

Why this contract matters for Utah projects

Who prepares and signs this contract in Utah

Owners, general contractors, subcontractors, and design professionals commonly use the Cost Plus or Fixed Fee Construction Contract Utah for building, renovation, and infrastructure projects.

  • Project owners seeking transparency, defined change orders, and enhanced cost oversight on construction projects.
  • General contractors managing subcontractor payments, allowances, and schedule coordination under a clear fee structure.
  • Subcontractors who need defined payment timelines and approved reimbursable cost categories.

Local counsel or construction counsel often reviews the form to ensure compliance with Utah lien law and licensing requirements.

Core contract elements to include in Utah agreements

Core elements to include in a professional Cost Plus or Fixed Fee Construction Contract Utah that protect parties and clarify performance and payment.

Scope of Work

Provide detailed project description, specifications, drawings, and a clear list of exclusions. Attach plans as exhibits and reference standards to avoid scope disputes during construction and change order evaluation.

Pricing Structure

Define whether contract is cost-plus (state reimbursable categories, fee method) or fixed fee (lump sum). Detail markups, overhead allocation, and basis for pricing adjustments including escalation clauses.

Change Orders

Set written change order procedures, approval authorities, pricing methods, and time extensions. Require itemized cost backup and signatures before work proceeds to prevent billing disputes.

Schedule and Delays

Include project milestones, critical path, liquidated damages or delay allowances, and notice requirements for excusable delays. Tie payment schedule to completed milestones and identify force majeure triggers.

Insurance and Bonds

Specify required insurance types and limits, certificate submission timing, and performance or payment bond amounts. Make contractor responsible for subcontractor compliance and listing owner as additional insured.

Dispute Resolution

Choose governing law (Utah), venue, and dispute process: negotiation, mediation, then arbitration or court. Detail interim relief, attorney fees allocation, and survival clauses for claims.

Step-by-step to complete the contract correctly

Follow these steps to complete a Cost Plus or Fixed Fee Construction Contract Utah accurately before signatures and project start.

  • 01
    Review Scope: Describe work, deliverables, and exclusions in plain terms to avoid disputes.
  • 02
    Select Pricing: Choose cost-plus formula or fixed lump-sum and define fee basis.
  • 03
    List Costs: Specify reimbursable cost categories, documentation, and allowable markups.
  • 04
    Sign and Date: Ensure authorized signers, dates, and witness or notary steps are completed.

Recommended online workflow settings for e-execution

Configure your online workflow to collect signatures, attach exhibits, set authentication, and automate notifications for payments and change orders.

Field Configuration Examples: signer order, authentication, and reminder schedule
Signer Order Set role-based sequence or parallel signing
Authentication Method Email link, SMS code, or KBA for higher assurance
Attach Exhibits Upload drawings, specifications, and permit documents
Notifications Auto-notify owner, contractor, and lender on execution

Typical execution and distribution flow

Typical routing and document flow for executing a Cost Plus or Fixed Fee Construction Contract Utah.

  • Prep Document: Assemble scope, pricing, and supporting exhibits.
  • Review Parties: Legal and owner review, make edits.
  • Signatures: Authorized signers execute, notarize if required.
  • Distribute Copies: Provide executed PDF to all stakeholders and lenders.

Digital signing and integration considerations

Digital signing and eSubmission options for Utah construction contracts vary by integration needs and signer authentication.

  • Formats: PDF and DOCX accepted; preserve exhibits.
  • Integrations: Procore, NetSuite, Salesforce, Google Workspace
  • Authentication: Email link, SMS, SSO, and multi-factor options

Security and compliance basics relevant to contracts

Encryption: TLS 1.2/1.3 in transit; AES-256 at rest
Certifications: SOC 2 Type II; ISO 27001
HIPAA: BAA required for PHI workflows
Audit Trail: Timestamp, IP address, action log
Access Controls: Role-based permissions; SSO supported
21 CFR Part 11: Electronic records compliant options

Common deadlines and timing considerations

Key deadlines for contract administration, invoicing, lien notices, and retention intervals under Utah law and project schedules.

Invoicing Frequency:

Follow contract terms; typical monthly invoicing with Net 30 payments

Retainage Release:

Release per milestones or after substantial completion per contract

Lien Notice Deadline:

File mechanic's lien per Utah Code deadlines; verify local timing requirements

Change Order Response:

Owners typically respond within 7–14 days to avoid delays

Record Retention:

Keep final executed contract for at least seven years, per industry practice

Key project milestones from award to closeout

Project milestone timeline from contract award through final closeout and lien waiver releases for construction projects.

01

Contract Award

Execute contract, set effective date, and distribute signed copies.

02

Preconstruction

Submit schedules, insurance certificates, and permits before mobilization.

03

Billing Milestones

Invoice per agreed milestones; include cost backup for reimbursements.

04

Closeout

Deliver final lien waivers, as-built drawings, and final invoice for release.

Common preparation pitfalls to avoid

  • Ambiguous scope of work leads to frequent change order disputes and schedule delays that increase project cost and strain owner-contractor relations.
  • Failing to document reimbursable cost categories or provide receipts leads to audit failures and owner refusal to reimburse claimed expenses.
  • Not including required contractor licensing numbers or bonds can trigger stop-work orders and state fines under Utah licensing law.
  • Neglecting notarization or witness where required by lenders or local rules can complicate record acceptance and financing draws.

Consequences of incorrect or incomplete contracts

Late Payment: Interest, suspension rights
Incorrect Pricing: Disputed invoices, withheld payments
License Violations: State contractor fines
Lien Waiver Errors: Loss of lien rights
Unclear Scope: Change order disputes
Contract Invalidity: Improper signatures risk unenforceability

Practical examples of contract use in Utah projects

Real-world scenarios showing how Utah parties use cost-plus or fixed-fee construction agreements in public and private projects.

Municipal Renewal Project

A Utah city contracted a general contractor under a cost-plus contract to renovate a municipal facility, requiring transparent reimbursable cost tracking.

  • The owner required weekly cost reports and capped fee percentage to control budget.
  • The defined change order process and retained audit records prevented disputes and facilitated timely payments from public funds, while preserving bid competitiveness and contractor accountability throughout completion.

Commercial Tenant Fit-Out

A developer hired a contractor on a fixed-fee basis for a retail tenant fit-out, attaching detailed drawings and allowances for specialty fixtures.

  • The contract required progress-linked draws and final lien waivers at each payment milestone.
  • Clear milestone definitions and retained deliverables enabled the owner to certify completion, expedite lease commencement, and process lender draws without supplemental paperwork.

Cost-plus versus fixed-fee at-a-glance

Quick comparison of cost-plus and fixed-fee contract variants to determine suitability for Utah projects and risk tolerance.

Criteria Cost Plus Fixed Fee
Risk Allocation owner pays overruns contractor absorbs overruns
Price Certainty lower certainty high certainty
Change Orders flexible priced per change
Suitable Projects complex or evolving scope well-defined scope

eSignature vendor pricing snapshot for contract execution

Pricing snapshot for eSignature vendors commonly used to execute construction contracts; signNow appears first for placement in comparative view.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No cap 100 envelopes/user/year Varies by plan Varies by plan Varies by plan

FAQs — validating and correcting executed contracts