Site Plan
Shows property lines, setbacks, location of deck relative to house, utilities, easements, and existing structures; essential for zoning clearance and floodplain checks.
A properly completed Construction Deck Permit documents structural responsibility, ensures inspections occur at required milestones, and confirms the project meets code, zoning, and safety standards enforced by the local authority having jurisdiction.
Different parties are involved depending on project scale, liability, and local rules.
Confirm local requirements early: some jurisdictions require owner signatures, others allow contractor-only filing, and some mandate a licensed engineer’s stamp.
| Field | Configuration |
|---|---|
| Applicant Info | Required text fields with validation for phone and email |
| Attachments | Accept PDF/DOCX plans up to municipal size limits |
| Signature Routing | Sequential signing: applicant → contractor → engineer |
| Notifications | Email/SMS alerts for submission and inspection scheduling |
Many jurisdictions accept electronic permit submissions and eSignatures; confirm the local building department’s accepted formats and authentication level.
Confirm whether your jurisdiction requires notarization, witnessed signatures, or RON for any supporting affidavits, and choose a platform that supports those authentication methods if needed.
Shows property lines, setbacks, location of deck relative to house, utilities, easements, and existing structures; essential for zoning clearance and floodplain checks.
Plan views and elevations indicating dimensions, joist layout, ledger attachment, footings, stairs, and railings; reviewers use these to verify structural adequacy.
Rafter/joist sizes, span tables, ledger flashing details, fastener schedules, and connection methods; critical for load and uplift resistance verification.
Footing size, depth, and bearing capacity or engineer’s recommendation, especially where frost depth or poor soils affect foundation design.
License number, proof of insurance, and business contact information to demonstrate contractor qualification and local compliance.
Clear description of work and estimated construction value to determine applicable fees and permit classification.
Submit as a single PDF with layers flattened and pages in order; include a title block with project address and revision date for clarity.
Provide stamped PDFs for engineered designs; if calculations are separate, label them to match relevant drawing sections.
Include contractor license, insurance declarations, energy compliance forms, and any local affidavits required by the jurisdiction in PDF format.
Downloadable signed permit or certificate in PDF format for posting at the job site during inspections.
7–30 business days depending on workload and whether engineering review is required
3–14 business days per resubmittal round for corrective items
Immediately after approval and payment; electronic issuance common
Typically 48–72 hours after request; some jurisdictions have longer wait times
Issued after final inspection and any outstanding items are cleared
Complete application package and upload plans to the permitting portal
Building department performs structural and zoning review and issues comments
Address review comments and resubmit revised documents
Pay fees and receive permit documents authorizing work
Tim used online signing to manage permits across multiple properties, reducing administrative overhead.
Brian emphasized usability for both staff and external reviewers.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Yes, varies | Yes, varies | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |