Project Identification
Project name, contract number, client, and project manager contact information to link the form to project records and permit files for retrieval and audit.
A well-structured form clarifies scope, documents compliance with permits and utility locates, and creates a traceable record for safety and claims review.
The Construction Drilling & Excavation Form is completed by parties responsible for planning and authorizing subsurface work before mobilization.
Final signed copies are retained by the project file owner, permitting authority, and on-site superintendent for reference during excavation and inspections.
The on-site superintendent or authorized contractor signatory accepts operational responsibility for excavation methods, safety measures, and adherence to permit conditions. Their signature certifies that crews were briefed, required locates were obtained, and controls are in place prior to drilling or trenching activities.
The property owner or designated project agent signs to confirm authorization of work, budgetary approval, and acceptance of scope. This signature is used to validate consent for site access and to allocate responsibility for permit compliance and post-work restoration.
Project name, contract number, client, and project manager contact information to link the form to project records and permit files for retrieval and audit.
Address, GPS coordinates, work area map, and nearest landmark or stationing so drill crews and utility locators can identify exact bore or excavation positions on site.
Detailed description of drilling or excavation methods, target depths, bore diameters, expected soil types, dewatering needs, and shoring or trenching methods to be used.
List of required municipal, state, and utility permits, permit numbers, and proof of utility locates (e.g., ticket numbers) to demonstrate regulatory conformity.
Required safety measures, traffic controls, spill prevention, dust mitigation, and monitoring plans. Include designated competent person and emergency contacts.
Signature blocks for contractor, owner, and any third-party inspectors; include printed name, title, date, and any notarization or witness fields if required.
| Field | Configuration |
|---|---|
| Authentication Method | Email link with optional SMS code |
| Routing Order | Sequential: contractor → owner → inspector |
| Conditional Fields | Show environmental controls when groundwater present |
| Retention Policy | Auto-archive signed forms to project folder |
Choose a platform that supports secure e-signatures, audit trails, and integrations with project systems to minimize manual steps.
Submit with permit application as required by local agency
Allow 48–72 hours or longer depending on local ticketing systems
Deliver soil reports before drilling mobilization
Complete signatures at least 24 hours before work start
Retention begins on the form’s effective date
Compile scope, locates, geotech, and permit references for reviewer verification.
Project manager and safety officer verify fields and attachments for accuracy.
Obtain owner and permitting authority or inspector signatures as required.
Dispatch crews once signed documents and locates are confirmed on site.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |