Scope
Clear scope of work with limits and exclusions, including equipment lists and work area boundaries for erection activities.
A concise, complete Construction Erection Document reduces on-site ambiguity, aligns stakeholders on sequence and responsibilities, and documents safety and inspection requirements.
Typical preparers and signers include contractors, structural engineers, project managers, the property owner or developer, and permitting officials.
Accurate roles and signatures ensure enforceability, reduce inspection delays, and establish who is accountable for deviations or change orders.
Clear scope of work with limits and exclusions, including equipment lists and work area boundaries for erection activities.
Step-by-step sequencing, rigging diagrams, crane placements, and temporary support details required to assemble structural components.
Site-specific safety precautions, fall-protection strategy, shoring criteria, and emergency procedures tied to the erection sequence.
Designated approval blocks for the contractor, engineer of record, and owner or authorized representative, including dates and titles.
Pre-lift checklists, hold-points for building department inspection, and documentation capture requirements for each critical stage.
Referenced drawings, load charts, crane certifications, material delivery schedules, and insurance certificates as enforceable exhibits.
| Field | Configuration |
|---|---|
| Approval Order | Engineer → Contractor → Owner |
| Authentication | Email + SMS code for key signers |
| Required Attachments | Lift diagrams, crane certs, insurance |
| Hold-Point Flags | Conditional fields that block progression until verified |
Use a platform that supports PDF, DOCX, conditional fields, and secure eSignatures with an audit trail.
Ensure the chosen service supports required attachments, stores an immutable audit trail, and can export ISO 32000-compatible signed PDFs for permitting and archival.
Varies by jurisdiction; allow plan reviewers several weeks
Submit critical-lift notifications as required by local code
Schedule inspections at designated hold-points before proceeding
Obtain engineer and owner acceptance before demobilization
Retain signed record in project folder promptly after completion
A contractor provided a stamped erection plan for staged assembly
Engineer supplied rigging diagrams and crane limitations
| Criteria | Erection Document | Permit Drawings |
|---|---|---|
| Primary Purpose | execution sequencing | regulatory approval |
| Typical Signers | contractor & engineer | permit applicant |
| Attachment Needs | lift charts & rigging | full plan set |
| Legal Role | operational exhibit | basis for permit conditions |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |