Cover Sheet
Project identification, applicant contact, permit application checklist, sheet index, and general notes that orient reviewers and link all other drawings together.
A complete, code-compliant Construction Permit Plan Set reduces review delays, lowers the chance of rejections, and creates a defensible record for inspections and appeals. Accurate submissions protect contractors and owners from stop-work orders, fines, and liability during construction.
Several professionals collaborate to assemble and submit a plan set; responsibilities differ by role and by jurisdiction.
Coordinated input from design, engineering, and contracting teams helps prevent omissions and speeds permit approval.
Project identification, applicant contact, permit application checklist, sheet index, and general notes that orient reviewers and link all other drawings together.
Property boundaries, setbacks, existing and proposed structures, parking, access routes, utility connections, and topography details used to verify zoning and drainage compliance.
Floor plans, elevations, sections, material schedules, and accessibility details that demonstrate spatial layout, egress paths, and code-required fixtures and finishes.
Framing plans, load calculations, foundation designs, connection details, and engineer seal showing compliance with structural codes and wind/seismic requirements.
Mechanical, electrical, and plumbing schematics, load calculations, equipment schedules, and riser diagrams required for systems review and utility coordination.
Grading, drainage, erosion control, and stormwater management plans demonstrating site runoff control and conformance to local public works standards.
Provide high-resolution PDF/A for drawings and embedded fonts; native CAD files may be requested by some jurisdictions for redline overlays and review.
Use a clear sheet index and consistent naming convention so reviewers can quickly locate referenced details and correlate comments to specific pages.
Include revision clouds and a revision table; keep previous stamped versions archived to show the change history during permit processing.
Attach structural calculations, equipment cut sheets, soil reports, and stamped engineer letters as separate labeled PDFs for reviewer convenience.
Often 15–30 business days for routine projects; larger projects can take 60–90 days.
Authorities commonly request corrections with a 30-day resubmission period to maintain review queue position.
Inspections are scheduled as work progresses; lead times vary from same-day to several business days.
Permits commonly expire after 6–12 months of inactivity unless renewed or extended.
Hearing timelines are jurisdiction-dependent and can add weeks to months to the schedule.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |