Connection Type
Describe splice method (weld, bolted splice, mechanical coupler, grout sleeve), orientation, welding procedure spec (WPS), bolt grade and torque, and any factory preassembly requirements with inspector acceptance criteria.
Using a Construction Pile Connections document centralizes technical details, reduces miscommunication on site, supports code compliance, and creates a verifiable record for inspections and payments. Clear specifications help avoid rework, support contractor claims, and streamline permit and closeout processes.
Typical users include structural engineers, general contractors, specialty pile contractors, and site inspectors responsible for foundation integrity and compliance.
Proper assignment of roles ensures timely review, clear responsibility for corrective action, and reliable acceptance evidence for owners and lenders.
Describe splice method (weld, bolted splice, mechanical coupler, grout sleeve), orientation, welding procedure spec (WPS), bolt grade and torque, and any factory preassembly requirements with inspector acceptance criteria.
List plate thicknesses, steel grades (ASTM A36, A572), corrosion protection (galvanizing, coatings), filler materials, grout mixes, and fastener specifications including manufacturer part numbers and certificates of compliance.
Provide factored axial, lateral, and moment loads for each connection, allowable tolerances, load path notes, design standard references (AASHTO, ACI, AISC), and required safety factors.
Attach detail drawings, shop sketches, material tags, and connection schedules. Include reference drawing numbers, scale, welding symbols, dimensional tolerances, and QR codes or tag IDs for field tracking.
Specify required inspections (visual, NDT), acceptance criteria, frequency, responsible parties, testing lab qualifications, weld documentation, and required certificates of compliance for materials and field tests.
Outline step-by-step installation sequence, lifting and alignment procedures, torque sequence for bolted splices, protection during concrete pour, environmental limits, required crew certifications, and inspection sign-offs.
| Field | Configuration |
|---|---|
| Define signer routing and order | Sequential routing; engineer signs before contractor and inspector |
| Authentication level and verification methods | Email plus SMS OTP for contractor; ID check optional |
| Required attachments and naming conventions | Attach drawings/PDFs; use project-code_prefix for file names |
| Archive location and retention policy | Save to project folder in Box or Procore with retention tags |
Select a platform that supports PDF, DOCX, secure storage, and integrates with project management tools used on site.
Submit prior to fabrication; allow 5–10 business days for review.
Engineer approval required before shop drawings released.
Schedule field inspection within 48 hours of installation completion.
Submit NDT and load test reports within seven calendar days.
Sign-off and archive after passing inspections and correcting punch items.
Engineer issues connection design and acceptance criteria.
Approve shop drawings and material submittals before fabrication.
Fabricate components, tag per ID system, and perform QA.
Install, inspect, test, and obtain final acceptance documentation.
Martin Properties used digital forms to replace paper submittals for foundation connections across multiple sites, improving document control and access.
BIS standardized electronic acceptance for structural connections to meet procurement audit requirements and to centralize compliance documentation across contracts and projects.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |