Cover Sheet
Project title, project team contacts, sheet index, revision block, code designations, and general project data to orient reviewers and bidders.
Clear, coordinated plans and well-written specifications reduce change orders, support accurate bids, and establish measurable acceptance criteria. They also serve as the primary reference for permit review, contract administration, and dispute resolution throughout the project lifecycle.
Multiple parties rely on plans and specifications at different stages, from design to construction closeout.
Ensuring each user’s responsibilities are documented helps prevent misinterpretation and accelerates approvals and project delivery.
Project title, project team contacts, sheet index, revision block, code designations, and general project data to orient reviewers and bidders.
Scaled floor plans, elevations, sections, and interior details that define spatial layouts, materials, and dimensions for building elements.
Structural, MEP (mechanical, electrical, plumbing), and civil drawings showing systems, load paths, and coordination requirements for construction.
Written performance and material standards, testing requirements, submittal procedures, and quality control expectations for each trade.
Project milestone schedule, phasing, material lead times, and installation sequencing that affect procurement and permitting.
Enlarged construction details, connection drawings, and finish work instructions that eliminate ambiguity during installation.
| Field | Configuration |
|---|---|
| Submitter Role | Owner or authorized agent |
| Reviewer Sequence | Design team → code check → structural → MEP |
| Authentication | Email link, SMS code, or advanced auth |
| Audit Trail | Capture timestamp, IP, and signer identity |
Confirm the file formats, authentication, and e-signature methods accepted by the receiving authority before submitting.
Align your submission package with local portal requirements and keep a versioned archive that includes the audit trail for every signed set.
Often 1–3 business days to accept or reject initial submission
Single review may take 10–30 business days
Resubmissions typically allowed within 30–90 days
Depends on inspections and fee clearance
Cannot begin until permit issuance
An owner used digital plan sets for a multi-unit renovation to avoid multiple in-person signings
A development team issued coordinated drawings and specs to bidders via secure eSubmission
Project owners or their authorized agents sign approvals for budget, scope, and final acceptance. Their signature confirms funding authority and triggers contractually required payments and permits.
Licensed architects or engineers apply seals and signatures attesting to design compliance with professional standards and applicable building codes; their stamp is often required for permit acceptance.
Final coordinated set ready for internal sign-off and stamping
Submit signed plans and specifications to the authority having jurisdiction
Authority issues permit after review and corrections
Contractor begins on-site work following permit issuance
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year limit | Varies | Varies | Varies |