Site plan
Shows roof area and property boundaries with dimensions and orientation; supports permit reviewers in verifying scope.
A proper Construction Roof Permit protects property owners, contractors, and occupants by ensuring work meets local code and safety standards, enables required inspections, and preserves insurance coverage and resale value.
Different parties touch a roof permit at various stages — knowing who is responsible prevents delays.
Assign clear roles before submission to speed review and inspections.
A licensed general or roofing contractor signs when they assume responsibility for compliance, scheduling inspections, and ensuring work follows approved plans. They must provide license numbers, insurance details, and a point of contact for inspections and code questions.
The property owner signs when applying as the responsible party or when granting permission for work; owners must confirm accuracy of site information and may be held liable for unpermitted work or code violations discovered during or after construction.
| Field | Configuration |
|---|---|
| Applicant info | Required, validated text fields |
| Document uploads | PDF/DOCX required with size limits |
| Signature | Electronic signature field with audit trail |
| Notifications | Email alerts for reviewer actions |
Confirm the receiving authority accepts electronic submissions and which eSignature standards they require before using an online workflow.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Shows roof area and property boundaries with dimensions and orientation; supports permit reviewers in verifying scope.
Concise description of removal, replacement, or repairs with square footage and staging notes for phased work.
Manufacturer product data sheets, wind-rating, and installation instructions required for code compliance.
License numbers, proof of insurance, and contact information to confirm legal authority to perform work.
Required when framing or deck changes affect load paths; stamped when jurisdiction requests.
Requested inspection points (e.g., underlayment, final) to align reviewer visits with construction milestones.
PDF, DOCX; drawings often as PDF
Include PDF spec sheets for selected products
Certificate of insurance PDF with policy number
Fully executed agreement or authorization for owner-builders
1–6 weeks depending on complexity and local backlog
Often 6–24 months to start work, varies by locale
1–2 weeks lead-time typical for busy municipalities
Responses to corrections typically due within 30 days
Issued after passing final inspection and outstanding fees resolved