Scaled site map
Accurate scale, north arrow, legend, property lines, and easements to orient all reviewers and contractors on existing conditions.
A precise site plan documents regulatory compliance, minimizes on-site conflicts, and streamlines permitting and inspections. It provides a single point of reference for contractors, subcontractors, and municipal reviewers to coordinate safety, utilities, and site logistics.
Several stakeholders prepare, review, or act on site plans during a construction project.
Each party’s role affects which sections of the plan they author or verify; clarify responsibilities in contracts and permit applications.
Accurate scale, north arrow, legend, property lines, and easements to orient all reviewers and contractors on existing conditions.
Show proposed structures, overhangs, and setbacks with dimensions and distances to property lines.
Spot elevations, contours, drainage patterns, and stormwater controls to demonstrate compliance with local stormwater ordinances.
Locations for water, sewer, gas, electric, and telecom services, including connection points and required clearances.
Driveways, parking, loading areas, pedestrian routes, and construction vehicle access with turning templates if required.
Silt fencing, sediment basins, site fencing, temporary exits, and safety signage required for permitting and inspections.
| Field | Configuration |
|---|---|
| Version control | Use numbered revisions and date-stamped files |
| Reviewer order | Set municipal review, engineer, contractor sequence |
| Authentication | Use email or access code for reviewer identity |
| Audit trail | Record timestamps, user IDs, and change notes |
Electronic submission and signatures can accelerate permitting when platforms meet legal and technical requirements.
Ensure your chosen platform supports required file types, audit trails, and any municipality-specific ePortal integrations before submitting.
Check local building department lead times.
Expect 2–6 weeks for formal plan review cycles.
Book inspections per municipality rules; allow lead time.
Coordinate plan approval with subcontractor mobilization.
Save approved plans per local retention guidelines.
Submit initial plan set to authority of jurisdiction for first review.
Revise plans and upload formal responses to reviewer comments.
Obtain approved permit and stamped plan set before mobilization.
Hold coordination meeting to confirm staging, safety, and inspections.
A contractor submitted a stamped site plan with staging diagrams to avoid road closures.
A city required erosion-control details for a hillside development.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Check vendor site for current trial terms | Check vendor site for current trial terms | Check vendor site for current trial terms | Check vendor site for current trial terms |
| Bulk Send | Yes — Business Premium and up | Available on select DocuSign plans | Available on select Adobe plans | Available on select PandaDoc plans | Limited bulk capabilities |
| Audit Trail | Yes — full audit trail and timestamps | Yes — full audit trail | Yes — full audit trail | Yes — audit trail available | Yes — audit trail available |
| HIPAA Compliant | Yes (BAA available) | Yes (BAA available) | Yes (BAA available) | No | No |