Cover Sheet
Include project name, submittal number, date, preparer contact, and a concise description of contents so reviewers can identify scope quickly and route items correctly.
Accurate submittal drawings speed approvals, reduce fabrication errors, and align expectations among contractor, design team, and owner. They protect contractual obligations by documenting design intent, changes, and reviewer comments.
Typical participants involved in submittal workflows and their roles.
Each project may add specialized reviewers (e.g., MEP engineer) depending on scope and contract requirements.
| Field | Configuration |
|---|---|
| Upload format | PDF preferred | DWG optional |
| Routing order | Contractor > Architect > Owner |
| Authentication | Email or SMS code |
| Turnaround SLA | 7–14 business days typical |
Confirm file formats, authentication, and integrations before submitting to avoid rejections.
Use platforms that provide audit trails, version control, and integration with project management systems to maintain traceability through construction and closeout.
Include project name, submittal number, date, preparer contact, and a concise description of contents so reviewers can identify scope quickly and route items correctly.
List each attached item, action requested (approve, approve-with-comments, revise-and-resubmit), and required response date to establish the contractual review timeline and responsibility.
Provide detailed fabrication drawings with dimensions, materials, connection details, and references to contract drawings so fabricators and reviewers can verify fit and compliance.
Attach manufacturer data sheets, performance specifications, and installation instructions to show compliance with contract-required performance and code standards.
Include physical or photographic samples of finishes, colors, or assemblies when required; label samples and document sample IDs for acceptance and record-keeping.
Track previous submittal numbers, revision dates, and reviewer comments so the team can trace changes and avoid reissuing outdated fabrication packages.
Submit submittals per schedule in contract closeout or procurement sections.
Common SLA: 7–14 business days for initial review
Allow identical time for revisions unless contract states otherwise
Do not fabricate until required approvals are documented
Keep signed approvals for project closeout and warranty periods
A contractor compiles curtain wall shop drawings and product data for architect review.
A municipal contractor submits mechanical equipment cut sheets and control diagrams to the engineer.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Varies | Varies | Varies | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |