Scope of Work
List exact core locations by plan reference, diameter and depth of each core, number of samples, and any required lab tests or sample custody procedures.
A concise Coring Agreement clarifies scope, avoids schedule disputes, and reduces the chance of accidental damage to utilities or finished surfaces. This reduces project delays and helps ensure consistent remediation, testing, and safety compliance.
Parties who prepare or sign Coring Agreements usually include owners, general contractors, specialty coring subcontractors, structural or geotechnical engineers, and testing laboratories.
Each party’s role should be clearly identified in the agreement so responsibilities for permits, site protection, testing, and restoration are unambiguous.
List exact core locations by plan reference, diameter and depth of each core, number of samples, and any required lab tests or sample custody procedures.
Specify which party secures permits, utility clearances, and any municipal notifications; include permit numbers when available and timelines for approvals.
Describe required PPE, barricading, fall protection, dust suppression, and whether a competent person, confined-space entry plan, or traffic control is required.
Define patch materials, compaction requirements, finish tolerances, curing times, and inspection procedures to confirm acceptance of repaired surfaces.
State limits of liability, required insurance types (GL, auto, workers’ comp), certificate holder details, and whether additional insured endorsements are required.
Include scheduled start and completion dates, milestone payments, holdbacks for remediation, and remedies for delay or failure to restore properly.
| Field | Configuration |
|---|---|
| Plan Attachment | Attach PDF plans with pinned core markers. |
| Insurance Certificate | Require uploaded COI before work start. |
| Permit Upload | Accept permit PDFs or permit numbers. |
| Signatures | Collect authorized signatures in sequence. |
Use an eSignature platform that supports document attachments, audit trails, and conditional field logic to collect permits and COIs before work begins.
A building owner requested 12 slab cores to test floor topping strength
A municipality authorized coring for utility verification
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Premium) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Submit permits at least 10–30 days before mobilization
Provide COI at least 5 business days before start
Define start and end dates and daily working hours
Deliver samples to lab within 24–48 hours
Complete patching within 7–14 days unless otherwise specified