Scope of Work
Describe the work with model numbers, glazing types, frame finishes, hardware details, and acceptance criteria so both parties understand deliverables.
A well-drafted agreement clarifies expectations, sets payment and warranty terms, identifies permit responsibilities, and reduces disputes. It protects owners and contractors by documenting scope, timeline, and remedies if work or materials differ from the plan.
Each audience uses the agreement to allocate risk, secure payment terms, and confirm compliance with building codes and local permit requirements.
The homeowner reviews specifications, approves finish and glass options, provides site access, and makes payments per the schedule. They are responsible for disclosing site constraints and securing any HOA approvals unless the contract assigns that duty to the contractor.
The contractor supplies materials, performs installation to code, schedules inspections, and provides warranties. They must hold required licenses and insurance, obtain permits if contractually required, and document changes and sign-offs for final payment.
| Field | Configuration |
|---|---|
| Signature Method | Electronic signature with audit trail |
| Authentication Level | Email link or SMS code for client |
| Reminder Schedule | Two automated reminders before due dates |
| File Format | Signed PDF/A stored in cloud |
Describe the work with model numbers, glazing types, frame finishes, hardware details, and acceptance criteria so both parties understand deliverables.
List brand names, product codes, glass performance ratings, thermal values, and installation tolerances to avoid substitution disputes.
State deposit, progress payments, final holdback, and ways to handle additional costs for unforeseen conditions or change orders.
Provide target lead times for manufacture and installation, and define excusable delays, weather allowances, and notice requirements.
Specify manufacturer warranties, contractor workmanship warranty, limitation of liability, and procedures for warranty claims and repairs.
Require written change orders for scope or price changes and state which party secures permits and pays permit fees.
Client signs estimate and pays deposit to start ordering.
Obtain required permits before structural work or framing modifications.
Manufacturer produces panels; units arrive on site per lead times.
Install unit, complete sealing/finishing, and pass final inspection for final payment.
Quotes typically expire in 30 to 60 days due to material price changes.
Custom units commonly require 4 to 8 weeks for fabrication and shipping.
Municipal permit approval often takes 1 to 4 weeks depending on jurisdiction.
Typical install for a single unit is 1 to 3 days depending on site scope.
Warranties usually begin on the date of substantial completion or final sign‑off.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Trial varies by plan | Trial varies by plan | Trial varies by plan | Trial varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Integration with accounting, CRM, and project management systems reduces manual steps and centralizes signed agreement storage for audits.
A regional property manager standardized renovation contracts with digital signatures to speed approvals and scheduling.
A small development firm used eSignatures for subcontract agreements and material releases.