Job Identification
Project name, job number, address, and precise location description so records and invoices tie back to the correct site and contract documents.
A formal Cutting and Coring Work Order reduces ambiguity about scope, timing, and responsibility. It documents required clearances, hole locations, and protective measures so contractors and site owners can manage risk, coordinate inspections, and control liability.
Typical participants include contractors, property owners or managers, and project engineers who must coordinate site access and safety.
Use this work order whenever cutting or coring may affect structure, utilities, or public access to ensure clear authorization and documentation.
The Site Supervisor completes and issues the work order, confirms utility locates and permit status, and verifies site controls before coring begins. They serve as the on-site contact and initial approver for any change to scope or timing, and they keep a copy of the signed work order with daily logs.
The Project Manager reviews technical specifications, authorizes subcontractor selection, and approves final billing tied to the work order. They retain the executed document for contract administration, claims support, and archive according to retention policies.
Project name, job number, address, and precise location description so records and invoices tie back to the correct site and contract documents.
Diameter, depth, orientation, tolerance, and reinforcement proximity to avoid structural conflicts and to inform drill bit and rig selection.
Documentation that utilities were located and marked, including ticket numbers, clearance confirmation, and any required standby or isolation procedures.
Required pedestrian or vehicle detours, shoring, barriers, PPE, water suppression, and confined-space procedures tailored to the work location.
Scheduled start/finish times, site contact, lockout/tagout windows, and access instructions to coordinate with other trades and inspections.
Authorized signatures with printed names, titles, dates, and any required witness or notarization fields to validate acceptance and authorization.
| Field | Configuration |
|---|---|
| Document upload and template selection | Use a saved template to prepopulate repeatable job data. |
| Conditional approval routing | Route to different approvers when structural work is indicated. |
| Required attachments and photos | Make photos and sketches mandatory for location confirmation. |
| Signer authentication and audit trail | Enable email or SMS codes and capture timestamps. |
Ensure the selected system maintains an auditable history and secure storage; confirm HIPAA or industry requirements when sensitive data is present.
Varies by jurisdiction; allow 7–30 business days.
Standard locate windows commonly 2–5 business days.
Book subcontractor at least 3–7 business days ahead.
Inspector availability can add 1–5 business days.
Expedite approvals and document condition contemporaneously.
Initiator files work order and attaches site photos.
Utility locates and permit approvals recorded.
Cutting or coring executed per specifications.
Signed completion recorded and uploaded to project files.
Martin Properties standardized on a mobile work order for core-drilling approvals.
Optica Ventures used a template to coordinate subcontractors across multiple properties.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |