Establishing secure connection…Loading editor…Preparing document…

Cutting and Coring Work Order

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Cutting and Coring Work Order

Work Order No.:    Date Issued:

Client Name:    Contractor Name:

RECITALS

WHEREAS, Client requires specialized concrete cutting, sawing, and core drilling services at the Site described above for purposes of access, repair, or modification of existing structures; and

WHEREAS, Contractor is duly experienced, equipped, and licensed to perform concrete cutting and coring operations in accordance with industry standards and applicable law; and

NOW, THEREFORE, Client engages Contractor and Contractor accepts the engagement subject to the terms and conditions set forth in this Work Order.

SCOPE OF WORK

Contractor shall perform cutting, sawing, and core drilling as specified below. Contractor shall provide all labor, materials, equipment, tools, and supervision necessary to complete the work in a professional manner consistent with industry standards. Specific tasks include but are not limited to the following:

Estimated Start Date:    Estimated Completion Date:    Estimated Duration (days):

PERMITS, SAFETY, AND SITE CONDITIONS

Contractor shall comply with all applicable safety standards and obtain permits as required unless otherwise specified below. Client shall disclose known site conditions that may affect performance. The parties agree as follows:

Contractor to obtain necessary permits and pay associated fees.
Client to obtain necessary permits and pay associated fees.
Known hazardous materials on site disclosed by Client

PAYMENT TERMS

Contract Price (Total):

Late Payment Fee:    Retainage (if any):

CHANGES AND EXTRA WORK

All changes to the Scope of Work shall be performed only by written Change Order signed by both parties. Change Orders shall specify the change, adjustment to price, and any extension of time.

TERM AND TERMINATION

Term Start Date:    Term End Date:

Either party may terminate this Work Order for material breach if the breaching party fails to cure within the notice period below. Termination for convenience by Client is permitted upon written notice and payment for work performed to date and demobilization costs as set forth in this Work Order.

CONFIDENTIALITY

Each party shall treat as confidential all non-public information provided by the other party in connection with this Work Order and shall not disclose such information to third parties except as required by law or as necessary to perform the Work. Confidential information does not include information that is or becomes public through no fault of the receiving party or that the receiving party rightfully obtains from a third party without restriction.

INSURANCE, INDEMNITY, AND WARRANTY

Contractor shall maintain commercial general liability, workers' compensation, and automobile liability insurance at limits customary for the trade and shall provide certificates upon request. Contractor shall indemnify and hold harmless Client from claims arising out of Contractor's negligence or willful misconduct in performance of the Work. Contractor warrants its workmanship for a period of twelve (12) months from completion against defects in execution; this warranty does not extend to latent defects in existing structures or materials not supplied by Contractor.

DELAYS & FORCE MAJEURE

Neither party shall be liable for delays or failures in performance caused by events beyond the party's reasonable control, including but not limited to acts of God, strikes, labor disputes, governmental actions, severe weather, or unexpected site conditions; however, the affected party shall provide prompt written notice and take reasonable steps to mitigate the delay. Time extensions shall be granted for excusable delays but do not excuse payment obligations for work performed.

GOVERNING LAW

This Work Order shall be governed by and construed in accordance with the laws of the state identified below, without regard to its conflict of law rules.

ENTIRE AGREEMENT

This Work Order, together with any signed Change Orders and written attachments expressly incorporated herein, constitutes the entire agreement between the parties regarding the subject matter and supersedes all prior negotiations, representations, and agreements, whether written or oral. No amendment shall be effective unless in writing and signed by both parties.

Client:

Contractor:

By:

By:

Date:

Date:

Enter text✕

What a Cutting and Coring Work Order Is and When It’s Used

A Cutting and Coring Work Order documents authorization, specifications, and approvals for saw cutting and core drilling on a construction site or existing facility. It records scope (location, diameter, depth), scheduling, utility clearance, access instructions, safety controls, and responsible parties. The form creates a clear operational record for contractors, owners, and inspectors and helps coordinate permits, traffic control, and site protection. For projects affecting structural elements or utilities, the work order becomes part of the project file and may be relied on for invoicing, insurance, and compliance reviews.

Why a Formal Work Order Improves Safety and Accountability

A formal Cutting and Coring Work Order reduces ambiguity about scope, timing, and responsibility. It documents required clearances, hole locations, and protective measures so contractors and site owners can manage risk, coordinate inspections, and control liability.

Why a Formal Work Order Improves Safety and Accountability

Who Typically Prepares and Signs This Work Order

Typical participants include contractors, property owners or managers, and project engineers who must coordinate site access and safety.

  • General contractors coordinating subcontractors and scheduling site access and inspections.
  • Property owners or facility managers authorizing penetrations in occupied buildings or infrastructure.
  • Project engineers or site inspectors approving specifications, reinforcement, and traffic control.

Use this work order whenever cutting or coring may affect structure, utilities, or public access to ensure clear authorization and documentation.

Representative Roles and Responsibilities

Site Supervisor

The Site Supervisor completes and issues the work order, confirms utility locates and permit status, and verifies site controls before coring begins. They serve as the on-site contact and initial approver for any change to scope or timing, and they keep a copy of the signed work order with daily logs.

Project Manager

The Project Manager reviews technical specifications, authorizes subcontractor selection, and approves final billing tied to the work order. They retain the executed document for contract administration, claims support, and archive according to retention policies.

Essential Sections to Include in a Professional Work Order

A robust Cutting and Coring Work Order groups operational, safety, and administrative details so field crews, inspectors, and owners have the same information. Include explicit instructions, sketches, and references to permits.

Job Identification

Project name, job number, address, and precise location description so records and invoices tie back to the correct site and contract documents.

Hole Specifications

Diameter, depth, orientation, tolerance, and reinforcement proximity to avoid structural conflicts and to inform drill bit and rig selection.

Utility Clearance

Documentation that utilities were located and marked, including ticket numbers, clearance confirmation, and any required standby or isolation procedures.

Safety and Traffic Controls

Required pedestrian or vehicle detours, shoring, barriers, PPE, water suppression, and confined-space procedures tailored to the work location.

Schedule and Access

Scheduled start/finish times, site contact, lockout/tagout windows, and access instructions to coordinate with other trades and inspections.

Signatures and Approvals

Authorized signatures with printed names, titles, dates, and any required witness or notarization fields to validate acceptance and authorization.

How to Complete the Work Order, Step by Step

Follow a consistent sequence to ensure clearance, safety, and authorization before cutting or coring begins.

  • 01
    Identify the hole: Record precise location and dimensions.
  • 02
    Confirm utilities: Obtain and record locate ticket numbers.
  • 03
    Specify controls: Note safety, traffic, and shoring requirements.
  • 04
    Obtain approvals: Get authorized signature and date.

Where to Send or File the Completed Work Order

Routing depends on project procedures and whether digital submission is used. Typically the document is shared with the contractor, owner, and project files.

  • Contractor Records: Store executed copy with daily logs and task assignments.
  • Owner/Manager: Provide signed copy to property owner or facility manager.
  • Project Folder: Upload to the contract management system or project folder.
  • Inspector or Permit Office: File or present copy if required for inspection or permit closeout.

Configuring an Online Work Order Template

Set up the digital template to capture required fields, attachments, and approvals so every execution is consistent and auditable.

Field Configuration
Document upload and template selection Use a saved template to prepopulate repeatable job data.
Conditional approval routing Route to different approvers when structural work is indicated.
Required attachments and photos Make photos and sketches mandatory for location confirmation.
Signer authentication and audit trail Enable email or SMS codes and capture timestamps.

Digital Sharing and Signing Requirements

Ensure the selected system maintains an auditable history and secure storage; confirm HIPAA or industry requirements when sensitive data is present.

  • Integrations: Supports Salesforce, NetSuite, Procore, Google Workspace.
  • Supported formats: PDF, Word DOCX, HTML, Excel.
  • Authentication options: Email link, SMS code, or advanced methods.

Typical Timelines and Processing Expectations

Work order timelines depend on permitting, utility locates, and contractor availability. Anticipate review time and coordinate required inspections.

Permit application lead time:

Varies by jurisdiction; allow 7–30 business days.

Utility locate response:

Standard locate windows commonly 2–5 business days.

Scheduling core drilling:

Book subcontractor at least 3–7 business days ahead.

Inspection or sign-off:

Inspector availability can add 1–5 business days.

Emergency work:

Expedite approvals and document condition contemporaneously.

Key Milestones from Request to Completion

Track milestones to manage coordination and evidence collection; each stage should have an owner and target timeframe.

01

Request Submitted

Initiator files work order and attaches site photos.

02

Clearances Obtained

Utility locates and permit approvals recorded.

03

Work Performed

Cutting or coring executed per specifications.

04

Closeout and Archive

Signed completion recorded and uploaded to project files.

Common Mistakes to Avoid When Preparing the Work Order

  • Vague location descriptions that lead to drilling the wrong area and cause rework or property damage.
  • Failing to confirm utility locates or relying on outdated tickets, increasing risk of striking concealed services.
  • Omitting safety or traffic control details, which can create noncompliance with site or municipal requirements.
  • Not attaching photos, sketches, or as-built drawings, which weakens evidence for claims and approval.

Potential Consequences of Incomplete or Incorrect Work Orders

Structural Damage: Repair costs and liability exposure.
Permit Violations: Fines or stop-work orders.
Injury Liability: Worker or public injury claims.
Contractual Delay: Schedule impacts and liquidated damages.
Insurance Denial: Claims may be disputed for inadequate documentation.
Rework Costs: Additional mobilization and materials expense.

Real-World Examples of Work Order Use on Projects

Field teams and owners use standardized work orders to speed approvals and reduce errors on retrofit or tenant-improvement projects.

Martin Properties

Martin Properties standardized on a mobile work order for core-drilling approvals.

  • Used e-signature and photos for location verification.
  • "I can process and execute all of these documents online with 100% compliance and built-in security. Whether on mobile or working offline, I can get forms back to their necessary parties efficiently."

Optica Ventures LLC

Optica Ventures used a template to coordinate subcontractors across multiple properties.

  • The template included ticket numbers and safety controls.
  • "The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers."

Security and Compliance Controls to Capture in the Record

Encryption In Transit: TLS 1.2/1.3
Encryption At Rest: AES-256
Certifications: SOC 2 Type II, ISO 27001
HIPAA BAA: Available upon request
Audit Trail: Timestamps, IP, and action log
Access Controls: SSO and role-based permissions

Practical Tips for Accurate, Efficient Work Orders

Apply consistent procedures and capture evidence at the time of request to minimize delays and support claims or inspections later.

Confirm site access and utilities
Verify utility locate tickets, arrange standbys if required, and document access points and keys. Clear communication with the utility owner reduces risk of service interruptions or injuries.
Record hole locations and depths precisely
Use grid references, photos, and measurements. Avoid ambiguous language like "near column"; instead provide coordinates or measured offsets from fixed points to reduce errors.
Attach site photos and markings
Photograph the planned area, mark it on the drawing, and attach images to the work order so everyone can confirm the intended location before work starts.
Coordinate traffic and safety plan
Document required barriers, flaggers, and PPE. Confirm who will implement controls and note responsibility for removal to avoid misunderstandings and regulatory violations.

eSignature Pricing and Feature Snapshot for Executing Work Orders

Comparison of representative eSignature providers and core plan-level criteria; signNow is listed first for alignment with platform-focused guidance.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial Yes, 7-day trial Varies Varies Varies Varies
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently Asked Questions About Cutting and Coring Work Orders

Answers to common questions about execution, signatures, notarization, and recordkeeping for cutting and coring work orders.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users