Establishing secure connection…Loading editor…Preparing document…

Design Approval Final Approval Drawings

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

DESIGN APPROVAL — FINAL APPROVAL DRAWINGS

Project Name:

This Design Approval and Final Approval Drawings Certification (the Agreement) is entered into as of by and between:

Client Name:

Designer Name:

WHEREAS

WHEREAS, Client has engaged Designer to prepare design documents, drawings and related deliverables for the Project identified above; and

WHEREAS, Designer has prepared Final Approval Drawings and supporting documents and submits those deliverables to Client for final approval and authorization for fabrication, procurement, or construction; and

WHEREAS, the parties desire to set forth the terms for final approval, acceptance criteria, payment for final deliverables, and post-approval change procedures.

SCOPE OF WORK

Client shall have calendar days from delivery of the Final Approval Drawings to review and either provide written approval or detailed comments documenting required corrections. Written approval or failure to provide material comments within the review period shall constitute acceptance of the drawings for the limited purposes stated herein.

PAYMENT TERMS

Invoices not paid within days of the invoice date shall incur a late fee of % per month or the maximum lawful rate, and Client shall reimburse Designer for collection costs and reasonable attorney fees incurred to enforce payment.

TERM AND TERMINATION

Term Commencement Date: . Anticipated Term Completion Date: .

Either party may terminate this Agreement for cause upon material breach by the other party if such breach remains uncured for days after written notice. Upon termination, Client shall pay Designer for all work performed to the termination date, including reimbursable expenses and any irrevocable commitments.

CONFIDENTIALITY

Each party shall hold in confidence all confidential and proprietary information disclosed by the other party in connection with the Project and shall not disclose such information to third parties except to those employees, consultants or contractors who have a need to know and who are bound by obligations of confidentiality at least as protective as those herein. Confidential obligations shall survive termination for years, except for information that is public through no breach or required to be disclosed by law.

INTELLECTUAL PROPERTY AND LICENSE

Designer retains copyright and other intellectual property rights in the designs and drawings. Upon full payment of invoiced amounts for the Final Approval Drawings, Designer grants Client a non-exclusive, non-transferable license to use the Final Approval Drawings solely for construction, fabrication, and operation of the Project at the Project site. Any reuse, modification or use for other projects requires Designer’s prior written consent and may be subject to additional fees.

CHANGES AFTER FINAL APPROVAL

Client acknowledges that issuance of Final Approval authorizes procurement and fabrication. Any revisions requested by Client after Final Approval shall be treated as Change Orders and billed at Designer’s then-current rates or as otherwise agreed in writing. Designer shall not be liable for costs associated with fabrication, procurement, or construction that arise from Client-initiated changes after Final Approval unless Designer expressly agrees in writing to such changes.

Client acknowledges and agrees that final approval of the drawings authorizes Designer to proceed (or to release drawings to fabricators/suppliers) and that such approval may trigger fabrication or procurement activities at Client’s cost.

GOVERNING LAW

This Agreement shall be governed by and construed in accordance with the laws of the State of without regard to its conflict of law principles. Exclusive venue for disputes shall be the courts located in that State, unless the parties agree otherwise in writing.

REPRESENTATIONS; LIMITATION OF LIABILITY

Each party represents it has authority to enter into this Agreement. Designer’s services are professional in nature; Designer shall perform with the skill and care ordinarily exercised by design professionals. Except as expressly provided herein, Designer makes no other warranties, express or implied. To the maximum extent permitted by law, Designer’s liability for any claim arising out of or related to this Agreement shall be limited to direct damages not to exceed the total amounts paid to Designer for the Final Approval Drawings; in no event shall Designer be liable for consequential, special or punitive damages.

ENTIRE AGREEMENT

This Agreement, including any attachments, exhibits, and referenced drawings, constitutes the entire agreement between the parties with respect to the subject matter and supersedes all prior discussions, proposals, and agreements. Any amendment to this Agreement must be in writing and signed by authorized representatives of both parties.

NOTICES

Client

Printed Name:

By:

Date:

Designer

Printed Name:

By:

Date:

Enter text✕

What the Design Approval Final Approval Drawings Are

Design Approval Final Approval Drawings are the finalized set of drawings, specifications, and annotated changes that a design team and client sign off to authorize construction, fabrication, or permit submission. The set typically includes stamped plans, revision history, schedules, material callouts, and a formal sign-off block for each stakeholder. Once signed, these drawings become the controlling design documents for procurement, building permit review, and contractor work. Electronic signatures applied in accordance with the ESIGN Act (15 U.S.C. §7001) and applicable state law create a legally enforceable record when intent, consent, attribution, and retention are satisfied.

Why a Final Approval Set Matters for Risk and Delivery

A formally approved drawing set reduces disputes by locking design scope, enabling permit filings, and triggering procurement and construction. Clear final approval protects parties by creating a dated record of accepted revisions and responsibilities, enforceable under ESIGN and UETA where applicable. Maintaining one agreed-upon final set simplifies change control and helps meet inspection, warranty, and contractual milestones.

Why a Final Approval Set Matters for Risk and Delivery

Typical Users and Stakeholders for Final Approval Drawings

The Design Approval Final Approval Drawings are used by both internal project teams and external parties who must authorize build or fabrication work.

  • Architects and design leads responsible for issuing coordinated, stamped drawings for construction.
  • General contractors and subcontractors who require clear, signed scope to mobilize work and order materials.
  • Owners, developers, or client representatives who confirm the design meets contract requirements and standards.

Ensure each listed stakeholder signs the designated approval block and that copies are archived with the project record.

Step-by-Step: Preparing and Executing Final Approval Drawings

Follow these steps to prepare a complete, auditable final approval package suitable for electronic or printed signature.

  • 01
    Assemble package: Collect final plans, specs, and revision log into one PDF.
  • 02
    Mark revisions: Highlight changes and include a concise revision summary page.
  • 03
    Internal review: Have lead designers and engineers review for constructability and code compliance.
  • 04
    Obtain approvals: Send to client, contractor, and certifying engineer for signature and dating.

How Electronic Final Approval Works in Practice

A clear e-signature workflow speeds approval while preserving legal evidence of consent, identity, and timestamping.

  • Upload: Sender uploads final PDF or DOCX for signature.
  • Place fields: Add signature, date, and checkbox fields at approval locations.
  • Authenticate: Signers authenticate via email link, SMS code, or stronger methods.
  • Capture audit: System records IP, timestamp, and action history for the signed file.

Typical Digital Workflow Settings for Final Approval Drawings

Below are configuration items commonly used when routing final drawings for sign-off. Adapt settings to your security and audit needs.

Field Configuration
Upload file PDF | PDF or DOCX
Signers Signers | Designer, Client, Approver
Authentication Authentication | Email + SMS code
Notifications Notifications | Email on completion

Technical Requirements and Integrations for eSubmission

Ensure the eSignature platform supports required security, formats, and integrations before routing final approval drawings.

  • File formats: PDF, DOCX, and common CAD exports supported
  • Integrations: Salesforce, NetSuite, Google Workspace, Procore available
  • Authentication: Email, SMS, or advanced signer verification

Confirm platform meets industry compliance needs such as audit trail, encryption, and any required BAAs for health-related projects.

Typical Timelines and Deadlines for Final Approval

Timelines vary by project and permitting authority; plan for internal and external review windows to avoid construction delays.

Designer internal review:

Allow 3–7 business days depending on package complexity

Client review window:

Commonly 5–10 business days for client sign-off

Permit authority review:

Agency review can range from 2 weeks to several months

Fabrication lead time:

Start after final sign-off; typically 2–8 weeks

Change request window:

Allow 3 business days for minor clarification responses

Key Milestones: From Draft to Final Approval

The sequence below outlines primary milestone stages to track progress and handoffs toward final sign-off.

01

Draft Issuance

Initial coordinated drawing package issued for internal QA.

02

Design Review

Technical review by engineers and architects to confirm details.

03

Client Approval

Client or owner confirms acceptance of the final design.

04

Permit/Release

Signed set is filed with authorities or released to construction.

Security and Compliance Considerations

Encryption: TLS 1.2/1.3 in transit; AES-256 at rest
Audit Trail: Timestamped history with signer attribution
Certifications: SOC 2 Type II and ISO 27001 available
HIPAA: HIPAA support available with BAA
21 CFR Part 11: Capabilities for FDA-regulated submissions
Accessibility: WCAG 2.0 Level AA compliance

Consequences of Incomplete or Incorrect Final Approval Drawings

Permit denial: Missing approvals can result in permit rejection
Work stoppage: Contractor delays and increased labor costs
Change order disputes: Unclear scope leads to claims and litigation risk
Code violation fines: Municipal fines for noncompliant construction
Warranty exposure: Unauthorized changes may void warranties
Rework costs: Material and labor rework increases project budget

Common Preparation Errors to Avoid

  • Failing to consolidate revisions into one final set, which creates multiple competing versions and increases dispute risk.
  • Using inconsistent project names or drawing numbers across documents, causing misfiling and procurement errors on-site.
  • Omitting required signatures or dates from the approval block; unsigned items may be treated as unapproved by authorities.
  • Submitting unflattened PDFs that allow post-signature edits, undermining the integrity of the signed record.

Real-World Examples of Final Approval Workflows

These brief case notes show how teams formalize final approvals and the operational benefits realized.

Optica Ventures LLC

Optica centralized final drawing issuance to remove ambiguity in contractor packages.

  • The clear sign-off reduced RFIs.
  • According to company leadership, standardizing signed final sets shortened procurement cycles and reduced onsite clarifications, enabling faster milestone acceptance without additional field revisions.

Martin Properties

Martin Properties processed approvals entirely online for remote stakeholders.

  • Mobile signing allowed field sign-off.
  • The approach provided consistent audit trails and allowed the firm to meet permit deadlines while avoiding in-person meetings and reducing administrative follow-ups.

Who Is Authorized to Sign Final Approval Drawings

Design Lead

A licensed architect or engineer who certifies the drawings is typically authorized to sign and date the final set, indicating technical responsibility and code compliance for the design.

Owner / Authorized Signatory

The project owner or an authorized company representative signs to accept the design scope, authorize construction, and confirm contractual obligations under the project agreement.

Representative eSignature Vendor Pricing and Capability Comparison

Compare common plan features and starting prices across vendors; signNow is listed first. Confirm vendor websites for current plan specifics before purchasing.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies Varies Varies Varies
Bulk Send Yes (Business Premium) Varies by plan Varies by plan Varies by plan Varies by plan
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No cap 100 envelopes/user/year Varies Varies Varies

FAQs and Troubleshooting for Final Approval Drawings

Answers to common questions about validity, signing methods, notarization, and correcting signed final approval drawings.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users