Title Block
Project name, address, client, designer, sheet number, and revision date in a standard block to ensure traceability across permit and construction sets.
A complete, accurate design landscape drawing reduces ambiguity in bidding and construction, supports permit applications, and documents owner and contractor obligations. Well-prepared drawings speed approvals and limit costly rework during installation or inspection.
Designers, contractors, permitting officials, and property owners interact with landscape drawings at different stages.
Keeping roles clear on a drawing helps assign responsibility for revisions, approvals, and as-built documentation.
A licensed landscape architect or registered designer typically prepares and signs the design drawing, certifying the plan meets professional standards and local code requirements; their signature may be required for permit approval and contractor reliance.
The property owner or authorized representative must acknowledge acceptance of the design and terms, confirm site access and constraints, and sign to authorize construction and permit submission when required.
Project name, address, client, designer, sheet number, and revision date in a standard block to ensure traceability across permit and construction sets.
Graphic scale and a north arrow showing orientation; scales must be chosen for legibility (commonly 1"=10' or 1"=20').
Measured property lines, existing structures, utilities, tree protection zones, and proposed hardscape/planting footprints with dimensions.
Clear legend naming materials, plant species, quantities, and abbreviations so contractors can price and source items correctly.
Scaled construction details for retaining walls, pavements, irrigation heads, and grading transitions that indicate materials and assembly.
General notes on installation standards, tolerances, soil preparation, warranty, and referencing applicable codes or manufacturer specifications.
| Field | Configuration |
|---|---|
| Signature Field | Require signature and date |
| Approval Order | Client → Designer → Contractor |
| Authentication Method | Email verification and optional SMS code |
| Document Format | PDF/A output recommended |
Ensure the platform supports secure PDF handling, audit trails, and required signer authentication before e-submitting.
Use a platform that provides an immutable audit trail and exportable signed PDF so permit offices and contractors receive verifiable, tamper-evident documents.
7–14 days for markup and approval
Generally 2–8 weeks depending on jurisdiction
7–21 days after comments issued
Expect 30–90 days for complex sites
Begin after permit issuance and signed contracts
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day free trial | Yes | Yes | Yes | Yes |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Tim Martin, Founder at Martin Properties, used digital signing to execute permits remotely and avoid site delays
John Butler, Founder at Fertility Centers of Illinois, integrated eSign workflows with existing systems to route design approvals