Establishing secure connection…Loading editor…Preparing document…

Design REV Drawings

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Design REV Drawings

This Design REV Drawings Agreement (the Agreement) is entered into as of by and between:

RECITALS

WHEREAS, Client desires that Designer prepare revised design drawings, specifications, and related deliverables for the project identified below; and

WHEREAS, Designer represents that Designer has the professional skills, experience, and capacity to perform the design services described in this Agreement and will perform such services in accordance with generally accepted industry standards; and

WHEREAS, the parties desire to set forth their respective rights and obligations with respect to the preparation, revision, delivery, acceptance, and payment for the Design REV Drawings.

PROJECT IDENTIFICATION

SCOPE OF WORK

Designer shall produce revised drawings (REV Drawings) consisting of plan views, elevations, sections, details, and specifications necessary for the Client's review, permitting and construction as applicable. Deliverables shall include those items designated below and any additional items expressly agreed in writing.

Construction drawings
Elevations / sections
Detail drawings
Specification documents
BIM / CAD files

REVISIONS, ACCEPTANCE AND SCHEDULE

Designer will provide initial revised drawings and up to revision rounds at no additional fee. Additional revision rounds requested by Client will be billed as stated below. Client shall provide consolidated written review comments within days of delivery to avoid delay.

PAYMENT TERMS

Client shall pay Designer the fees set forth below in consideration for the services and deliverables. Unless otherwise stated, all sums are payable in United States dollars and are due in accordance with the schedule below.

TERM AND TERMINATION

This Agreement commences on the date first written above and continues until completion of the Services or earlier termination in accordance with this section. Either party may terminate this Agreement for material breach by the other party if the breach remains uncured thirty (30) days after written notice.

Commencement Date:

Anticipated Completion Date:

CONFIDENTIALITY

Each party shall maintain the confidentiality of information clearly designated as confidential or which by its nature should reasonably be treated as confidential ("Confidential Information"). Confidential Information does not include information that: (a) is or becomes publicly available other than through a breach of this Agreement; (b) was lawfully in the receiving party's possession prior to receipt from the disclosing party; (c) is received from a third party without restriction and without breach of a contractual obligation to the disclosing party; or (d) is independently developed by the receiving party without use of the disclosing party's Confidential Information.

The receiving party will not disclose Confidential Information to any third party except to its employees, consultants, or contractors who need such information to perform the Services and who are bound to confidentiality obligations at least as restrictive as those set forth herein. Upon termination or at the disclosing party's request, the receiving party shall return or destroy Confidential Information as directed.

INTELLECTUAL PROPERTY

Designer retains ownership of all original design documents, drawings, models and instruments of service produced by Designer (collectively, the Designer Materials), except that Client is granted a non-exclusive, non-transferable license to use the Final Deliverables solely for the Project and for which payment has been made in full. Any reuse of Designer Materials on other projects or for modifications by others shall be at Client's risk and only with Designer's prior written consent.

WARRANTIES AND LIMITATION OF LIABILITY

Designer warrants that services will be performed in a professional manner consistent with industry standards. EXCEPT FOR THE FOREGOING, DESIGNER MAKES NO WARRANTIES, EXPRESS OR IMPLIED. TO THE MAXIMUM EXTENT PERMITTED BY LAW, IN NO EVENT SHALL EITHER PARTY BE LIABLE FOR INDIRECT, INCIDENTAL, CONSEQUENTIAL, OR PUNITIVE DAMAGES. DESIGNER'S AGGREGATE LIABILITY FOR ANY CLAIM ARISING OUT OF OR RELATING TO THIS AGREEMENT SHALL NOT EXCEED THE AMOUNTS PAID BY CLIENT TO DESIGNER UNDER THIS AGREEMENT.

GOVERNING LAW; DISPUTE RESOLUTION

This Agreement shall be governed by and construed in accordance with the laws of the state of without regard to its conflict of law principles. The parties agree to attempt in good faith to resolve disputes informally prior to initiating litigation.

ENTIRE AGREEMENT

This Agreement, together with any attachments, exhibits and written amendments signed by both parties, constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior and contemporaneous agreements, understandings, negotiations and discussions, whether oral or written. Any modification or waiver of this Agreement must be in writing and signed by both parties.

NOTICES

Notices under this Agreement shall be in writing and delivered to the addresses set forth above or to such other address as either party may designate by notice in accordance with this section. Notice is effective upon receipt.

Client

Party Label:

By:

Date:

Designer / Contractor

Party Label:

By:

Date:

Enter text✕

What Design REV Drawings Are and why they matter

Design REV Drawings are revised construction or design drawings that document changes to previously issued plans. They record updates to dimensions, materials, details, and annotations after design reviews, RFIs, or client change requests. REV drawings typically include a revision log, revision clouds or callouts on affected sheets, a clear revision number and date, and any required professional seals or stamps. These documents serve as the authoritative set for permitting, fabrication, site work, and contract administration and are commonly distributed to contractors, subconsultants, and permitting authorities.

Why accurate REV drawings reduce risk and rework

Clear and controlled revision drawings reduce construction errors, help satisfy permitting requirements, preserve an audit trail for approvals, and limit disputes over scope. When paired with a compliant e-signature and version history, REV drawings provide objective evidence of who approved what and when, consistent with ESIGN (15 U.S.C. §7001) and state UETA rules.

Why accurate REV drawings reduce risk and rework

Who typically prepares and reviews REV drawings

The following roles commonly create, submit, and approve Design REV Drawings during a project lifecycle.

  • Architects and design engineers who update plans, add revision notes, and apply professional seals where required.
  • General contractors and specialty contractors who review revisions for constructability, schedule, and cost impacts.
  • Owners, developers, and permitting officials who review, accept, and file revised drawings for compliance.

Responsibility and sign-off depend on contract terms and local rules; typically the design professional stamps technical changes and the contractor acknowledges buildability.

Essential components of a professional REV drawing set

A complete REV set is structured so reviewers can quickly find changes, trace approvals, and apply updates in the field.

Revision header

A consistent header on each sheet showing project name, sheet number, revision letter/number, and revision date to ensure traceability across the set.

Revision log

A consolidated table listing each revision, date, author, brief description of change, and approval initials or signature for project records.

Revision clouding

Graphic callouts or clouds around changed areas with matching revision labels to direct reviewers to modified details quickly and unambiguously.

Affected details

Updated details, notes, schedules, or callouts with cross-references to other sheets so contractors can implement changes without ambiguity.

Professional seal

Where required by state law or contract, an architect or engineer seal and signature certifying technical accuracy and compliance.

Supporting materials

Associated specifications, calculation summaries, or revised schedules attached or referenced for a complete record of the change.

Key required fields on a Design REV Drawing

Project Name: Full project title
Revision Number: Sequential ID
Revision Date: MM/DD/YYYY format
Prepared By: Name and company
Discipline: Architect/MEP/Struct
Approval Signature: Typed/e-signed or wet-signed

Step-by-step: preparing and issuing a REV drawing

Follow a repeatable process to create, verify, and distribute revised drawings to reduce errors and record approvals.

  • 01
    Identify change: Document the reason, scope, and affected sheets before editing drawings.
  • 02
    Update drawings: Apply revision clouds, legends, and change notes on the affected sheets.
  • 03
    Log revision: Add or update the revision log entry with date and author details.
  • 04
    Approve and distribute: Obtain required signatures, then publish the new set to stakeholders with version control.

Configuring a digital REV drawing workflow

Set up consistent file naming, authentication, and delivery rules when you use electronic workflows to circulate REV drawings.

Field Configuration
Signature authentication method Email link, SMS code, or stronger identity proofing for critical approvals
File format and versioning PDF/A for record copies; retain original CAD files and a versioned PDF set
Template reuse Standardize title blocks and revision tables across projects for consistency
Integration points Connect to project management and cloud storage for automated distribution

Where revised drawings are filed and who receives them

Revised drawings move from the design team to internal reviewers, to permitting authorities, then to contractors and subcontractors.

  • Design team: Prepare and version the updated drawing set for review.
  • Internal QA: Design QA checks for consistency, code compliance, and constructability.
  • Permitting office: Submit sealed/approved revisions where local authorities require updated documentation.
  • Construction team: Distribute to site teams and subcontractors for implementation.

Digital submission and system requirements

Use a platform that supports signed PDFs, audit trails, and integrations with common project systems.

  • File formats: PDF, PDF/A, and original CAD files supported
  • Integrations: Salesforce, NetSuite, Microsoft 365, Google Workspace integrations
  • Authentication: Email, SMS, or advanced signer authentication

Ensure the chosen platform provides tamper-evident audit trails, secure storage, and export options to meet corporate and regulator needs.

Typical timing and deadline checkpoints for REV drawings

Track critical dates so revisions reach the right parties before fabrication or permit milestones to avoid delays.

Internal review deadline:

Allow 3–7 business days for QA checks

Contractor acknowledgment date:

Set a short review window to confirm constructability

Permit submission date:

Align with local filing cycles to prevent hold-ups

Fabrication cutoff:

Issue final revisions before shop drawing approvals

Field implementation date:

Communicate when changes take effect on site

Project milestones tied to revision issuance

A sequence of milestones helps schedule reviews, permitting, fabrication, and installation around revised design decisions.

01

Issue for review

Distribute draft revisions to internal and trade reviewers for comments.

02

Obtain approvals

Secure designer and, if required, owner or regulator approvals for the changes.

03

File for permit

Submit sealed revisions to the AHJ or permitting office where required.

04

Implement on site

Release approved revisions to site teams and update as-built tracking.

Common mistakes when preparing REV drawings

  • Omitting revision clouds or clear callouts leads reviewers to miss which details changed and increases rework risk.
  • Inconsistent sheet numbering or title block updates create version confusion and can cause incorrect installations on site.
  • Failing to obtain required professional stamps or signatures delays permit approvals and may invalidate submitted revisions.
  • Distributing unsigned or non-versioned PDFs prevents establishing a reliable audit trail for approvals and contract records.

Consequences of incorrect or incomplete REV drawing submissions

Permit rejection: Delayed project start
Construction delay: Increased labor costs
Additional costs: Rework and material waste
Liability claims: Professional exposure
Contract breach: Possible damages
Insurance issues: Coverage disputes possible

Real-world examples of electronic revision workflows

Teams in property and project management use electronic workflows to process revised drawings and approvals with fewer delays.

Tim Martin — Martin Properties

Project teams moved to an online approval process to centralize revisions and approvals.

  • Faster approvals reduced reissue cycles.
  • "I can process and execute all of these documents online with 100% compliance and built-in security. Whether on mobile or working offline, I can get forms back to their necessary parties efficiently."

Brian Fitzgibbons — Optica Ventures LLC

A small property developer standardized revision templates and digital sign-offs.

  • Consistent templates reduced review time.
  • "The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers."

Pricing and feature comparison for eSignature options used with REV drawings

Comparison of common capabilities and starting price points; signNow is listed first per vendor order requirements.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies Varies Varies Varies
Bulk Send Yes Varies Varies Varies Varies
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No cap 100 envelopes/user/year Varies Varies Varies

Practical tips for accurate and efficient REV drawing issuance

Adopt standard workflows and validation checks to reduce rework and support clear approval trails.

Consistent naming conventions
Use a single project and sheet naming standard across teams; include revision suffixes and dates to avoid version confusion.
Standardized revision log
Maintain a central revision log that lists every change, its impact, author, and approval to provide an auditable history.
Use e-signatures with audit trails
Collect approvals electronically with time, IP, and signer attribution to support compliance with ESIGN and UETA requirements.
Coordinate with permitting early
Confirm local authority requirements for seals, notarization, and file formats before finalizing and submitting revisions.

FAQs and troubleshooting for common REV drawing issues

Answers to frequent questions about approvals, signatures, filing, and correcting issued revisions.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users