Application Cover
Includes applicant details, project name, parcel identifiers, and a concise project summary to orient reviewers and link all documents.
Completing a Development Project Permit accurately reduces review delays, minimizes re-submission cycles, and establishes an enforceable record of approved work. Correct filings protect against stop-work orders, fines, and potential civil liabilities, and create a clear audit trail for inspections and future ownership transfers.
Several parties are commonly involved in preparing and submitting a Development Project Permit application.
Roles vary by project size; larger developments typically require multiple licensed professionals and dedicated project managers to manage reviews and conditions.
| Field | Configuration |
|---|---|
| Applicant Contact | Required; email and phone validated |
| Document Upload | PDF/DWG allowed; max file size enforced |
| Conditional Checklist | Shows only when project meets thresholds |
| Reviewer Routing | Route by discipline and project valuation |
Choose platform settings based on authentication needs and integrations with permitting systems.
Ensure the platform supports audit trails, retention export, and any agency-preferred integrations before launching eSubmission workflows.
Includes applicant details, project name, parcel identifiers, and a concise project summary to orient reviewers and link all documents.
Scaled drawings showing property boundaries, building footprints, grading, drainage, utilities, and construction phases required for technical assessment.
Stormwater, traffic, geotechnical, and structural reports prepared or stamped by licensed professionals to demonstrate compliance with standards.
Studies or checklists (e.g., CEQA/NEPA screening) and mitigation measures for sensitive habitats, wetlands, and protected resources.
Detailed fee worksheet and calculations for permit fees, impact fees, and bonds, showing how totals were derived for accurate billing.
Draft permit conditions, monitoring plans, and required performance guarantees that will form enforceable elements of approval.
Typical attachments include title reports, utility letters, easement plats, and professional certifications required for technical clearance.
Permit approvals are commonly issued as PDF/A for long-term archival and for consistent printing across systems.
Multi-sheet plan PDFs should be flattened with embedded fonts and include a revision block for version control.
Export the full record as a single ZIP containing signed PDFs, audit trail, and submission receipts for retention.
| Criteria | Development Project Permit | Building Permit |
|---|---|---|
| Primary Focus | site planning and land use | structural and code compliance |
| Typical Contents | plans, environmental studies | construction drawings, calculations |
| Approving Authority | planning/land use department | building department |
| Review Triggers | rezoning, subdivisions, major site change | occupancy change, new structures |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Business Premium+) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |