Scope
Defines doors, frames, units, and limits of work including exclusions and interfaces with adjacent trades.
A clear plan reduces installation errors, clarifies permit and inspection requirements, and allocates responsibility for materials and inspection signoffs; it also creates an auditable record for warranty and dispute resolution.
Signatures normally include the installer, a project manager, and the site owner or authorized representative to confirm completion and acceptance.
The installer signs to confirm that the specified door pads were installed per the plan, that materials used match the listed specifications, and that site safety protocols were followed during installation.
An owner or authorized agent signs to accept the work, confirm inspections were completed, and acknowledge responsibility for ongoing maintenance per the plan and warranty terms.
Defines doors, frames, units, and limits of work including exclusions and interfaces with adjacent trades.
Lists pad type, dimensions, mounting hardware, adhesives or fasteners, and manufacturer part numbers.
Provides elevation and plan view dimensions, clearances, and tolerances required for proper fit and function.
Specifies anchor types, spacing, substrate preparation, and torque or embedment requirements where applicable.
Identifies required municipal permits, inspection checklists, and who schedules or confirms inspections.
Describes final inspection items, test procedures, defect thresholds, and documentation to close the job.
| Field Mapping | Map measurements, model numbers, and permit IDs to dedicated form fields |
|---|---|
| Signer Order | Installer then owner representative in sequential order |
| Authentication | Use email verification or SMS codes for signer attribution |
| Notifications | Enable reminders for pending signatures and inspections |
| Storage | Store final PDF with audit trail in project folder |
Platforms with audit trails, role-based signer order, and integrations such as Salesforce, NetSuite, Box, or Procore simplify routing and record retention for project teams.
Submit before mobilization; municipality lead times vary from 3 business days to multiple weeks
Order pads and hardware at least 2–4 weeks before scheduled install
Schedule install with site operations to avoid occupied-hour conflicts
Book inspections early; some jurisdictions require 48–72 hours notice
Owner signoff should occur within 7 days of inspection completion
Site measurements, product selection, and scope confirmation before ordering materials.
Obtain any required municipal permits and safety approvals prior to installation.
Receive and inspect pads and hardware on site before installer mobilization.
Complete installation, schedule inspection, and secure owner acceptance and signatures.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Business Premium) | Available on plans | Available on plans | Available on plans | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |