Product Identification
Clear product name, model numbers, manufacturer, and intended application so the declaration maps precisely to procured goods.
A well-prepared draft EPD improves transparency, supports procurement compliance, and helps identify data gaps early. It reduces risk in bidding, informs embodied-carbon decisions, and speeds later third-party verification by documenting methodology and sources.
Clear product name, model numbers, manufacturer, and intended application so the declaration maps precisely to procured goods.
Define the functional unit used for the LCA (e.g., 1 m2 of cladding or 1 kg of material), since results depend on this baseline.
Specify cradle-to-gate, cradle-to-grave, or cradle-to-cradle scope along with included life-cycle stages and cut-off rules.
List datasets, databases, and dates used for unit processes, plus data quality assessments and any proxy or estimated inputs.
Present normalized impact indicator tables (e.g., GWP, ODP, AP, EP) and format units consistently for comparison.
Document allocation rules, end-of-life scenarios, temporal and geographic applicability, and any known uncertainties.
| Field | Configuration |
|---|---|
| Mandatory Product Fields | Require product name, manufacturer, and functional unit before submission. |
| Document Attachments | Allow PDF, DOCX, and CSV uploads; limit file size as needed. |
| Reviewer Sequence | Assign technical reviewer first, then QA, then verifier access. |
| Authentication | Enable email or SMS signer verification for traceable approvals. |
Ensure the chosen platform can capture signer IP, timestamps, and offer role-based access to protect data integrity.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A manufacturer compiles supplier LCI and produces a draft EPD for internal QA
A contractor submits a draft EPD with a tender as evidence of embodied-carbon performance
Coordinate responsibilities early and maintain clear sign-off points to reduce review cycles and ensure a defensible final EPD.