Scope
Define project boundaries, well count, surface and subsurface limits, excluded work, and the objectives that determine deliverables and approvals.
Centralizing technical details, permits, and approvals in a single document reduces mobilization errors, supports regulatory review, and preserves dispute evidence while improving coordination across teams and contractors.
Typical users and stakeholders who prepare, review, or sign the document include project managers, regulatory specialists, operators, and contractors.
Multiple signatures and approvals are common; establish a signing order and record custody to avoid processing delays.
Define project boundaries, well count, surface and subsurface limits, excluded work, and the objectives that determine deliverables and approvals.
Include wellbore schematic, casing programs, mud programs, anticipated lithology, directional plans, and engineering assumptions that contractors must follow.
List required permits, filing numbers, responsible parties, and any bonds or financial assurances tied to authorization to drill.
Attach safety plans, HAZOP/HAZID summaries, emergency response procedures, and environmental mitigation measures required during operations.
Provide milestone dates for mobilization, drilling phases, inspections, demobilization, and the timeline for final reports and as-built submissions.
Specify technical acceptance thresholds, inspection checkpoints, documentation to be delivered, and sign-off authority for each phase.
| Field | Configuration |
|---|---|
| Signer Order | Sequential required |
| Authentication | Email + SMS code |
| Required Fields | Conditional validation |
| Delivery Method | Email link and secure portal |
Ensure the platform supports secure uploads, flexible field types, reliable audit logging, and role-based access controls for project stakeholders.
Submit per agency schedule; allow 60–120 days for review.
May require 30–180 days depending on scope.
Request inspections at least 14–30 days before mobilization.
Community notice may require 7–60 days.
File within 30–90 days after completion.
Compile site data, impact studies, and initial designs.
Submit application and pay fees to permitting agency.
Contractor mobilizes, equipment arrives, drilling begins.
Complete as-built report and remedial actions.
| Criteria | Drilling Project Document | Well Permit Application |
|---|---|---|
| Operational Need | project-level | permit-level |
| Notarization | sometimes | often |
| Filing Agency | varies by state | state regulator |
| Environmental Review | possible | frequently required |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/yr | Varies | Varies | Varies |
A regional contractor adopted electronic project records to reduce turnaround on field approvals and mobilization.
An enterprise services firm centralized contract execution to meet audit and security requirements across distributed teams and vendors.
Responsible for compiling technical and scheduling content, coordinating contractors, and ensuring documents reflect the on-site plan. The project manager ensures required exhibits are attached, milestone dates are accurate, and that signatures are collected in the proper order for operational readiness.
Reviews permit language, confirms compliance with state-specific filing requirements, and documents legal authority for signatories. Counsel also advises on retention, public disclosure risk, and responds to agency deficiency notices or enforcement inquiries.