Scope of Services
Describe exactly which design tasks are included, such as load calculations, grounding design, conduit routing, permit-ready drawings, and utility coordination, and list explicit exclusions to avoid scope creep.
A precise agreement sets expectations for design scope, deliverables, deadlines, and permitting responsibilities, reducing change orders and utility rework. It helps allocate risk, define costs, and document who obtains approvals and inspections required for energized service.
These agreements are completed by parties involved in delivering electric service design work and those who rely on the design outcomes.
Identifying the right preparer and signer reduces administrative friction and ensures utility and municipal requirements are integrated early in design.
| Field | Configuration |
|---|---|
| Signer order | Sequential or parallel routing |
| Authentication | Email or SMS code |
| Required fields | Names, dates, signature blocks |
| Retention | Define storage period and access controls |
Describe exactly which design tasks are included, such as load calculations, grounding design, conduit routing, permit-ready drawings, and utility coordination, and list explicit exclusions to avoid scope creep.
State milestone dates for preliminary design, permit submittal, utility approvals, and final deliverables with remedies or adjustment procedures for delays caused by third parties.
Allocate permit application duties, site access obligations, design review cycles, and who coordinates with the electric utility to obtain service offers and metering requirements.
Detail fixed fees or time-and-materials rates, invoicing cadence, retainage, reimbursable expenses, and conditions for additional work authorizations and change orders.
Specify professional liability, general liability limits, indemnities, and required insurance certificates to align with project and utility risk expectations.
Define deliverable formats, review timelines, correction cycles, and final acceptance conditions tied to permitting and utility interconnection milestones.
Specify deadlines for preliminary and final drawings
Record target date for municipal or county filing
Set date to submit interconnection paperwork
Define expected inspection and correction periods
Tie invoices to deliverable acceptance
Parties sign and date the agreement; obligations begin.
Final permit-ready drawings delivered to owner and authority.
Utility issues service offer or interconnection approval.
Inspection passed and service connection energized.
| Document | Typical Use | Legal Focus |
|---|---|---|
| Electric Service Design Agreement | design work | scope, utility coordination |
| Utility Service Application | service request | service connection terms |
| Engineering Scope of Work | detailed tasks | technical deliverables |
| Construction Contract | build work | construction performance |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Free limited plan | Free limited plan |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/yr limit | Varies by plan | Varies by plan | Varies by plan |
An integrated developer engaged an electrical engineer to produce permit-ready utility service plans and coordinate interconnection
A healthcare system contracted for electric service design to support new clinical space