Scope of Work
Detailed description of circuits, equipment, and work limits; lists excluded tasks and site constraints.
A clear plan reduces rework, supports permit approvals, and documents compliance with electrical and building codes. It centralizes technical details, schedules inspections, and clarifies responsibilities so projects progress predictably and safely.
Typical contributors and recipients include licensed electricians, electrical engineers, general contractors, building owners, and municipal plan reviewers.
Proper role assignment in the plan speeds permitting and reduces disputes during installation and inspection.
Detailed description of circuits, equipment, and work limits; lists excluded tasks and site constraints.
Single-line diagrams, panel schedules, riser diagrams, and wiring details sized to local code requirements.
Calculated design loads and demand factors showing conductor and overcurrent protection sizing.
Manufacturer model numbers, ratings, conduit types, and quantities required for procurement and inspection.
List of required permits, submitting authority, application IDs, and inspection checkpoints.
Start/finish dates, lead times for long‑lead items, inspection windows, and commissioning tasks.
| Field | Configuration |
|---|---|
| Submission Trigger | Start when final drawings uploaded |
| Signer Order | Contractor -> Engineer -> Owner -> Inspector |
| Authentication | Email plus SMS code or stronger method |
| Storage | Secure cloud with versioning |
Choose platforms that support secure file formats, audit trails, and the authentication level required by the authority having jurisdiction.
Ensure the chosen method preserves timestamps and produces a tamper-evident audit trail for inspections and future disputes.
Submit once drawings and calcs are complete; review times vary by AHJ
Allow 1–6 weeks depending on complexity and local backlog
Book in advance; earliest available slot depends on inspector workload
Allow 1–2 weeks for corrections and follow-up inspections
Record completion date and retain documentation for warranties
Finalize drawings and calculations for permit submission
Authority grants permission to begin work on site
Inspector verifies wiring before concealment
Sign-off after commissioning and testing are complete
Remote document processing improved turnaround for site projects
Integrated signing with ERP sped approvals
The licensed electrician or electrical contractor signs to attest work will comply with code and the submitted design; their signature ties contractor liability and verifies qualifications for the AHJ.
The property owner or designated agent approves scope and payment terms, accepts the plan for construction, and authorizes permit applications and inspection scheduling.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |