Parties
Full legal names and business entities for all parties, including contractor, client, and any subcontractors or utility representatives who will accept responsibility.
Using a standardized Electrical Work Authorization Form clarifies responsibilities, reduces downtime, and documents consent for confined access, power shutdowns, and lockout/tagout procedures. It also helps support permit approvals and risk management in regulated environments.
Accurate completion and correct signatory authority reduce project delays and support compliance with workplace safety and permitting rules.
Full legal names and business entities for all parties, including contractor, client, and any subcontractors or utility representatives who will accept responsibility.
Clear, itemized description of tasks, affected circuits or equipment, steps to isolate power, and reference to related drawings, job numbers, or purchase orders for precise execution.
Required PPE, lockout/tagout procedures, testing requirements, qualified-personnel statements, and any site-specific hazard controls the crew must follow.
List of required municipal or utility permits, permit numbers if issued, inspection requirements, and who will schedule or be present for inspections.
Authorized access windows, estimated duration, outage start/stop times, and contingency plans for schedule changes or emergency work.
Signed authorization lines for the approving party, contractor representative, and any witness or inspector, plus date, printed name, and contact details.
| Field | Configuration |
|---|---|
| Required Fields | Make project, work description, and signatures mandatory. |
| Routing Order | Set approver sequence: facility manager → contractor → inspector. |
| Authentication | Use email with optional SMS code or stronger methods for critical jobs. |
| Attachments | Allow upload of permits, schematics, and lockout/tagout plans. |
Ensure the selected platform can retain complete audit records and export signed PDFs for regulatory or safety reviews.
Include municipal or utility permit PDFs showing permit number, scope, and any time-of-day restrictions to match the authorization.
Provide the step-by-step lockout/tagout procedure, responsible persons, and test method used to verify de-energization on site.
Add equipment tags and circuit identifiers so field crews can positively identify the components covered by the authorization.
Attach a checklist for pre- and post-work inspections to document safety verification and final acceptance.
Submit at least 48–72 hours before planned outage to allow reviews and permit confirmation.
Approvals often define a single-day window or specific hours for safe de-energization.
Permits may expire in 30–90 days; check permit terms before scheduling work.
Inspector scheduling can add 1–5 business days depending on jurisdiction.
File signed authorization immediately after closeout for compliance and audits.
Originator submits form and attachments for review.
Facility or safety officer verifies controls and LOTO steps.
Authorized representative signs and schedules the work.
Crew completes job, inspector signs off, records filed.
| Document Type | Common Use | eSignature Suitable |
|---|---|---|
| Authorization Form | consent for specified electrical work | |
| Permit Application | obtain municipal/utility permission | sometimes |
| Work Order | operational task assignment | |
| Contractor Agreement | broader contractual terms |
| Criteria | Electronic Signature | Digital Signature |
|---|---|---|
| Definition | any electronic method | pki-based cryptographic method |
| Legal Standing | esign/ueta accepted | esign/ueta accepted |
| Non-repudiation | audit trail evidence | cryptographic proof |
| Use Case | routine approvals | high-assurance or regulatory needs |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Business Premium) | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A store requests overnight power isolation for lighting retrofit
Surgery wing needs panel replacement during low-occupancy hours