Facility Overview
Basic asset identifiers, primary use, occupancy schedule, and construction vintage to contextualize energy use and measure applicability.
A consistent checklist improves data quality, reduces rework, and creates an auditable record for decision making and funding applications. It helps compare baseline and post-retrofit performance and supports compliance with utility or local benchmarking rules.
Typical users collect or review checklist data to support audits, retrofits, or reporting obligations.
The checklist also provides a single source of truth for operations teams, contractors, and compliance reviewers.
| Field | Configuration |
|---|---|
| Authentication | Use email + SMS or stronger signer verification where required |
| Conditional fields | Show system-specific fields only when that system exists |
| Template locking | Lock headers and instructions to prevent accidental edits |
| Notification routing | Send completed copies to owners, facilities, and auditors |
Choose a platform that preserves a tamper-evident audit trail, supports conditional fields for complex checklists, and integrates with your document repository for long-term retention.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Basic asset identifiers, primary use, occupancy schedule, and construction vintage to contextualize energy use and measure applicability.
Document insulation, windows, roofs, and air leakage observations that affect heating and cooling loads and retrofit priorities.
Record equipment make, model, capacity, controls, and observed operating conditions to support efficiency calculations and sizing.
Inventory lamp types, wattages, control strategies, and occupancy sensors to estimate lighting retrofit potential and schedule improvements.
Identify electric, gas, and submeter locations; capture recent usage and meter IDs for billing validation and baseline models.
List prioritized measures, estimated costs, simple payback, and any required permitting or contractor notes for decision-making.
Deliver a consolidated, signed PDF containing the completed checklist, photos, and recommendations for record retention and vendor review.
Provide a machine-readable export of measurements and meter readings for import into analysis and benchmarking tools.
Include dated, labeled photos of critical systems and deficiencies to support scope definitions and verification.
Attach or reference floor plans and equipment locations to reduce ambiguity during contractor bidding and implementation.
A building owner used standardized checklists across 12 properties to compare measures and costs efficiently.
A city energy manager collected consistent field data across libraries and community centers for benchmarking.
Book site visits 2–4 weeks in advance
Deliver finalized report within 10–30 business days
Submit with required documentation by program deadlines
Consider reassessment every 3–5 years
Retention period begins on assessment date
Owner requests assessment and provides utility accounts
Assessor completes measurements and photos
Analyst prepares recommendations and cost estimates
Owner and assessor sign final report and checklist