Project ID
Project name, address, permit number, and project contact with phone and email so the record is unequivocal for reviewers.
A concise Energy Code Compliance Checklist reduces review time, clarifies submission expectations for plan reviewers, and documents compliance evidence for inspections and future audits. It helps avoid costly resubmittals and supports consistent enforcement across projects.
The checklist is prepared and reviewed by multiple parties during design, permitting, and construction to ensure regulatory compliance and to streamline approvals.
Assigning clear roles for preparation, review, and signoff reduces ambiguity and speeds project milestones.
Project name, address, permit number, and project contact with phone and email so the record is unequivocal for reviewers.
Specify the applicable energy code edition, compliance path (prescriptive/performance), and any local amendments that change requirements.
Provide R-values, U-factors, glazing SHGC, and area-weighted calculations for walls, roofs, and fenestration per code criteria.
List equipment efficiencies, system types, economizer controls, and commissioning requirements demonstrating compliance with mechanical provisions.
Include lighting power density calculations, controls (occupancy, daylighting), and exterior lighting compliance information.
Attach modeled reports (COMcheck/REScheck or performance models), energy calculations, equipment schedules, and signed attestations.
| Field | Configuration |
|---|---|
| Project ID | Required; auto-assign from permit system |
| Attachments | Allow PDF upload; limit 50 MB |
| Reviewer Role | Sequential routing to plan reviewer |
| Sign-off | Final signer must provide name and date |
Use a platform that preserves an audit trail, supports required file formats, and meets relevant compliance standards.
Ensuring secure storage and a clear audit trail reduces disputes and provides verifiable evidence for audits or future sales.
Often 10–30 business days depending on AHJ workload
Commonly 10–30 days for revised submittals
May follow approval within 1–10 business days
Inspector availability often 3–14 days
After successful final inspection and documentation
Checklist completed with design-level assumptions.
Attach checklist to permit for reviewer evaluation.
Update checklist with as-built measurements and test results.
Signed checklist confirms code compliance for occupancy.
| Document Type | Typical Use | Primary Evidence |
|---|---|---|
| Energy Code Checklist | plan review | calculations and signatures |
| Permit Application | permit request | fees and drawings |
| Energy Model Report | performance path | simulation outputs |
| Certificate of Compliance | final approval | ahj-issued certificate |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |