Project ID
Unique project identifier, permit number, and address to link the worksheet to the permit and plan set; ensures traceability across reviews.
Completing a clear Energy Code Compliance Worksheet reduces review time, minimizes inspection failures, and documents compliance decisions for permitting and future reference. It creates an auditable record of assumptions, inputs, and signatory approval that supports enforcement, compliance tracking, and potential appeals.
Professionals from design, permitting, and construction use the worksheet to demonstrate and verify energy-code compliance during plan review and inspections.
Knowing the primary users helps assign responsibility for data collection, signoff, and ongoing retention.
Unique project identifier, permit number, and address to link the worksheet to the permit and plan set; ensures traceability across reviews.
Specify prescriptive, trade-off, or performance path with referenced code edition and sections so reviewers know which rules apply to the submission.
Window U-values, wall R-values, roof insulation, and glazing area percentages with calculation sources and tested values where applicable.
HVAC equipment efficiencies, controls strategies, economizers, and ventilation rates tied to code tables and performance targets.
Interior/exterior lighting power densities, control strategies, and any credits or allowances used in trade-off calculations.
Design professional and owner signatures with printed names, titles, and signature dates to confirm responsibility for the submitted data.
| Field | Configuration |
|---|---|
| Project ID | Required, read-only after creation |
| Signature Block | Required signer, date stamp enabled |
| Conditional Review | Trigger third-party review for performance path |
| Audit Trail | Enable timestamps and IP capture |
Use an eSubmission workflow that preserves an audit trail, preserves original file integrity, and supports required authentication levels.
10–30 business days for initial completeness check
15–60 calendar days depending on workload and compliance path
10–30 days after corrective items are addressed
Typically within 5–15 business days
Issued after satisfactory final inspection and documentation
A design team submitted a performance-path worksheet with model outputs and control narratives to the city reviewer.
A contractor provided an as-built worksheet showing installed efficiencies and tagged equipment cut sheets.
A building official or delegated reviewer signs to acknowledge that the worksheet meets local submission requirements. Their signoff records acceptance for permitting and typically appears on the project file for future inspections and audits.
The licensed architect, engineer, or energy modeler signs to certify accuracy of inputs and calculations. This signature assigns professional responsibility and is often required for code compliance attestations.