Property ID
Unique property identifier, address, facility type, and occupancy that allow consistent cross-referencing across program records and follow-ups.
A completed Energy Efficiency Assessment Form documents baseline conditions, supports funding eligibility, and clarifies priority measures for cost-effective upgrades. It reduces ambiguity in scope, makes technical recommendations auditable, and creates a consistent dataset for tracking savings over time.
Typical users include auditors, facility managers, owners, and program administrators who need a verified record of building energy characteristics.
Use this form to coordinate stakeholders and create a defensible, traceable basis for retrofit decisions and incentive claims.
Unique property identifier, address, facility type, and occupancy that allow consistent cross-referencing across program records and follow-ups.
Recent utility meter readings, billing period, and normalized kWh/therm or kBtu/sq ft values to establish a performance baseline.
Make, model, nameplate data, and age of HVAC, lighting, motors, and controls to identify retrofit candidates and efficiency ratings.
Room-by-room or system-specific checklist documenting condition, controls, insulation, air sealing, and observable maintenance issues.
Ranked measures with estimated energy savings, simple payback, and confidence level to support decision-making and incentive calculations.
Preliminary installed cost ranges, estimated implementation timeline, and notes on required permits or contractor scope.
| Field | Configuration | Type | Required | Conditional |
|---|---|
| Authentication | Email link with optional SMS code for higher assurance |
| Template | Save a reusable template with locked sections for auditors |
| Conditional Fields | Reveal cost estimate fields when a retrofit is proposed |
| Export Format | PDF/A for archive and CSV for data export |
Confirm supported file formats, integrations, and security standards before using an electronic workflow for assessments.
Commonly required within 30 days of site visit
Submit final report within 60 days to qualify for most rebates
Annual or on significant equipment changes
Upgrades often expected within 6–12 months
Deadlines and funding windows vary by program