Scope of Work
Detailed description of materials, equipment models, performance targets, and specific installation tasks so both parties understand deliverables and measurable efficiency outcomes.
A written Energy Upgrade Agreement aligns expectations, protects parties from liability, and documents performance metrics needed for rebates, incentives, or financing. Clear terms reduce disputes over scope, timelines, payment milestones, and warranty coverage while enabling compliance reviews by utilities or jurisdictions that require documentation for incentive programs.
Use this agreement when an upgrade involves third-party financing, rebate qualification, equipment warranties, or when clear acceptance criteria and inspection steps are needed.
General or specialty contractor under whom the work is performed. The contractor must be authorized to bind the business, provide licensing and insurance details, and accept warranty and remedy obligations for workmanship.
Property owner or authorized representative with legal authority to approve upgrades and payment terms. For multi-owner properties the signatory should be the designated fiduciary or property manager with documented signing authority.
Detailed description of materials, equipment models, performance targets, and specific installation tasks so both parties understand deliverables and measurable efficiency outcomes.
Clear payment schedule, any financed amount, interest or fees, conditions for final payment, and how incentives or rebates will be applied to reduce the owner’s net cost.
Start and completion dates, permit and inspection milestones, and remedies or liquidated damages for missed critical dates to manage project timing risk.
Manufacturer and labor warranties, maintenance obligations, guaranteed energy savings (if applicable), and measurement & verification procedures for performance claims.
Indemnity clauses, insurance minimums, and limits on consequential damages; clearly assign who is responsible for third-party claims and site safety.
Inspection process, sign-off criteria, documentation handover (manuals, permits, commissioning reports), and final payment release tied to acceptance.
| Field | Configuration |
|---|---|
| Signer Order | Define role-based signing sequence for owner, contractor, and program admin |
| Authentication Level | Choose email, SMS code, or stronger KBA/ID verification where required |
| Document Attachments | Require exhibits (scope, permits, equipment spec sheets) before final signature |
| Audit Trail | Enable timestamping, IP, and action logs for compliance review |
Ensure the platform can export signed PDFs with an audit trail and accommodate HIPAA or financing program requirements when applicable.
Sign before the program offer expiration date.
Schedule final inspection within 14–30 days after installation.
Submit completed documents within program-specific filing windows.
Begins on final acceptance or specified commissioning date.
Tie partial payments to posted completion milestones.
Owner approves scope and signs the agreement to authorize work.
Contractor obtains required permits and schedules inspections.
Work is completed according to the scope and manufacturer instructions.
System is tested, inspected, and accepted; final payment released.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
A municipal retrofit project tied to a grant required detailed scope and measurement protocols.
A homeowner used on-bill financing to replace HVAC and qualify for utility rebates.