Site Summary
Project location, parcel identification, site description, zoning, existing drainage features, and a concise project scope to orient readers and reviewers.
A well-prepared Environmental Drainage Report reduces regulatory risk, clarifies design requirements, prevents site damage from improper runoff management, and provides documentation needed for permits, financing, and construction. It also helps downstream stakeholders and local authorities evaluate potential impacts and ensure projects meet stormwater control standards.
Multiple parties rely on Environmental Drainage Reports during planning, permitting, design, and property transactions.
Each party uses the report for different purposes: regulators for compliance, designers for technical requirements, and owners for risk management.
Project location, parcel identification, site description, zoning, existing drainage features, and a concise project scope to orient readers and reviewers.
Existing ground elevations, spot grades, contours, and hardscape layout derived from survey or GIS data to support flow path and hydraulic analyses.
Methodology for runoff estimation (e.g., Rational, TR-55, or regional methods), rainfall data, time of concentration, and watershed delineation used to size systems.
Pipe/culvert capacities, open channel flows, pond routing, and backwater analysis demonstrating how systems convey or detain design storms.
Scaled plan sheets showing inlets, pipes, grading changes, stormwater best management practices, and construction notes for contractors and inspectors.
Maintenance schedules, inspection checklists, and ownership responsibilities to preserve system performance and meet permit conditions.
| Field | Configuration |
|---|---|
| Document Type | PDF with embedded calculations and plan sheets |
| Signer Authentication | Email link or two-factor authentication per agency preference |
| Retention Setting | Archive signed report as PDF/A for long-term access |
| Audit Trail | Enable timestamp, IP, and signer identity logging |
Commonly 15–60 days depending on local agency workload
Allow 1–3 weeks per resubmittal for minor corrections
May require conditions to be met before final approval
Drainage work often precedes major grading and foundation work
Submit within project closeout as required by the permit
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies | Varies | Varies |
A city required a drainage study for a multi-lot subdivision
A developer needed proof that redevelopment would not increase downstream flows