Site Survey
Topographic mapping, existing utilities, vegetation, and critical dimensions with coordinate references and photographic records to support design decisions and permit submittals.
A clear plan reduces geotechnical risk, documents mitigation measures for permitting, and assigns roles and inspection duties.
Typical users include a mix of technical, regulatory, and construction professionals who collaborate on site stabilization.
These parties coordinate to ensure the plan meets engineering standards, permit conditions, and long-term maintenance obligations.
Topographic mapping, existing utilities, vegetation, and critical dimensions with coordinate references and photographic records to support design decisions and permit submittals.
Borehole logs, lab soil classification, shear strength parameters, groundwater observations, and recommendations for factor-of-safety and allowable bearing to guide stabilization design.
Detailed drawings and specifications for retaining structures, soil nails, rock anchors, gabions, vegetative reinforcement, and erosion-control blankets, including materials and installation methods.
Surface and subsurface drainage plans, outlet details, and erosion-control inlets sized to local design storms to prevent concentrated flow and piping failures.
Instruments, inspection frequency, threshold values for alarm, photographic logs, and procedures for adaptive response if movements exceed limits.
Routine inspection tasks, seasonal maintenance activities, responsible parties, and long-term timelines for vegetation establishment and structural checks.
| Field | Configuration |
|---|---|
| Upload Document | PDF or DOCX file accepted |
| Assign Reviewers | Order or parallel routing |
| Authentication | Email link or SMS code |
| Notifications | Email reminders and status updates |
Use standard file formats and a platform that preserves signatures, audit trails, and attachments for regulatory review.
Submit prior to construction season or as permit requires
Expect 30–90 days depending on jurisdiction
Begin after permit issuance and site prechecks
Typically quarterly or as permit stipulates
After completion and successful monitoring period
A regional property developer digitized plan approvals to coordinate contractors and regulators.
A small developer used electronic routing to collect consultant sign-offs quickly.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies | Varies | Varies |